BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 8, 2022 at 8:00 PM

Updated January 26, 2024

Site work for a water / sewer project in Houston, Texas. Completed plans call for site work for a water / sewer project.

The estimate for this project is $7,115,231.18. The project includes the construction of underground storm sewer along Smith Road southward from HCFCD Unit P133-00-00 to Dory Lee Lane/HCFCD Unit P133-06-00 and along Dory Lee Lane/HCFCD P133-06- 00 eastward to HCFCD Unit P133-00-00. The project also involves the construction of cast-in-place concrete inlet and outlet structures, re-grading of roadside ditches along Smith Road, removal and replacement of driveway culverts along Smith Road

Bid Results

Water / Sewer

$11,338,255.00

Public - County

Site Work

89

17

2

4

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
390
Active Projects
150
Bidding Soon
3,821
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 11, 2022

September 12, 2022

Project location map

Smith Rd, Houston, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.