BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a military facility in Natchez, Mississippi. Working plans call for the renovation of a military facility.

As per the Owner the project has been cancelled. Editorial Content Team is actively seeking updated information CANCELLATION OF CONTRACT OPPORTUNITY FOR United States Coast Guard Cutter GREENBRIER for repair the metal roofing, ceiling tiles and all leaks. General: United States Coast Guard Cutter GREENBRIER is accepting proposals for qualified individuals or firms to repair the metal roofing, ceiling tiles and all leaks associated with. Prior to submitting a quote, it is mandatory to examine the performance work statement and it is highly recommended to visit the facility to take field measurements, evaluations, etc., and become familiar with existing conditions under which the work will be performed. After the award of contract, a pre-conference will be held prior to starting the work at Coast Guard Moorings Natchez, MS. Location: United States Coast Guard Cutter GREENBRIER 44 L.E. Barry Rd Natchez, MS 39120 I. Continuity of Facilities Operation: Schedule work to minimize interference with the facility's normal operations. Normal operating hours are from 6:45am to 4:00pm Monday thru Friday except federal holidays. Any work during other hours unless otherwise instructed or permitted shall be scheduled and approved with the Contracting Officers Representative. II. Notification of Start and Completion of Work: The Contractor shall notify Coast Guard one week prior to start of work. III. Coast Guard Contracting Officers Representative: The Contractor shall contact the COR to coordinate all construction efforts onboard Coast Guard Facilities. MKC Paul F. Malizzi Paul.F.Malizzi@uscg.mil 609-529-7132 REQUIREMENTS: Inspect, Repair and fix all associated leaks in UPH Roofing. 1. SCOPE 1.1 Intent. Contractor shall inspect all of the CST Roofing, identify damaged areas or areas with a high probability of failur and make repairs associated with findings, to include drywall/sheetrock (approx. 100 sq/ft) and drop ceiling tile (~100 24x24 tiles). Contractor shall inspect/test all installed infrastructure prior to and post completion of work. Contractor shall provide photographs of all inspected surfaces, and dispose of all waste. 1.2 Government-furnished property-None. 1.3 Contractor shall submit in writing to the COR any additional findings requiring additional funding, inspections or modifications to the original proposal. NO additional work may proceed without authorization from the Contracting Officer. CHARACTERISTICS: Metal Roofing. Fastened to the structure with screws and caulking, And 24"x24" drop ceiling tile. WARRANTY: A. Standard Manufacturer's Warranty for all replacement parts and materials IV: Recycling and Disposal of Refuse: Minor refuse, excess or waste materials resulting from construction operations may be disposed of in base dumpsters. All disposals shall be done in accordance with federal, state, and local laws and regulations. All bulk waste shall be disposed of by contractor. V: Safety: During the execution of this contract, the Contractor shall conform to the rules and regulations as set forth by OSHA Safety and Health Standards, 29 CFR Part 1926 - Safety and Health Regulations for Construction. The contractor shall have a written safety plan as required in FAR 5.236-13. The plan shall unequivocally assign responsibility and authority for safety to the superintendent by name. Immediate notification to the Contracting Officer's Representative of lost time due to accidents is required. Provide two copies of workman's compensation accident reports by noon of the day following the accident. The Coast Guard reserves the right to bar any workers or supervisors from the premises should they be documented as violating set safety standards and regulations. VI. Inspection: The Contracting Officer's Representative has the right to reject defective workmanship or materials or work not performed as per the project specifications. Only the Contracting Officer or his/her representative may accept work performed by the contractor.

Final Planning

Military

$300,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
31
Active Projects
16
Bidding Soon
273
All Active Projects
121
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 21, 2022

July 21, 2022

img_map_placeholder

44 L E Barry Rd, Natchez, MS


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.