BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Birmingham, Alabama. Completed plans call for the renovation of a 4,895-square-foot educational facility.

Volker Hall G133 Suite Renovations Prime Contractors that are properly licensed for this type of work are required to prequalify in order to bid. For more information about the project and how to prequalify, please go to the UAB Facilities Bid Calendar at portal Applicants for Prequalification are strongly encouraged to submit applications at the earliest date possible following the first date of advertisement. UAB will review applications as submitted and notify applicants within two (2) working days of submission. A. The scope of work for this project includes renovation approximately 4,895 square feet is Suite G133 of Volker Hall. The renovation area includes the following: 1. Three Simulation Rooms along with their associated Offices, and a Lab space. 2. The main corridor in the Suite will be included as an alternate. B. Scope of alterations work is indicated on drawings and generally as follows: 1. Selective demolition as indicated in the renovations areas. 2. Removal of the ceiling tile and lights (grid to remain and be modified and painted to receive new 2x2 ceiling tile, and new lights (lights to be furnished by Owner and installed by the contractor). Re-installation and modification to accommodate new ceiling grid, of any in ceiling fixtures or equipment (i.e. sprinklers, diffusers, fire alarm devices, etc.) unless specifically noted to be removed. 3. Removal of cabinets as noted on the drawings, and the repair of the VCT flooring and walls at these areas including the resilient base. 4. Removal of the fume hoods, capping of the vent ducts and other associated utilities, and repair of the VCT floor and base along with the ceiling in this area. 5. Painting of the walls and HM door frames of the rooms. C. Scope of Alternate No. 1 work includes alterations work as indicated on drawings for the main corridor: 1. Selective demolition of the ceiling and lights. 2. Installation of new Owner supplied light fixtures. 3. Painting of the walls and HM door frames.

Post-Bid

Educational

$260,000.00

Public - State/Provincial

Renovation

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
50
Active Projects
26
Bidding Soon
545
All Active Projects
210
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 23, 2022

July 25, 2022

img_map_placeholder

801 6th Ave S, Birmingham, AL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.