BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a residential development in New York, New York. Working plans call for the renovation of a residential development.

As of August 18, 2022, project is on hold. No definite date for the rebid. NYS Labor law requires that all contracted employees performing maintenance, repairs or capital improvements in state owned buildings receive the prevailing wage and supplements rate for the occupation in which they are working. If this is a public work contract covered by Article 8 of the Labor Law or a building service contract covered by Article 9 thereof, neither Contractor's employees nor the employees of its subcontractors may be required or permitted to work more than the number of hours or days stated in said statutes, except as otherwise provided in the Labor Law and as set forth in prevailing wage and supplement schedules issued by the State Labor Department. Furthermore, contractor must pay at least the prevailing wage rate and pay or provide the prevailing supplements, including the premium rates for overtime pay, as determined by the State Labor Department in accordance with the Labor Law. NYS law requires the vendor to keep detailed records for each person employed including name, address, telephone number, social security number, occupational classification in which worked, hourly wage rate paid, supplements provided, number of hours worked, and actual wages paid. Certified payroll record/s MUST be submitted at the time of invoicing. Effective April 28, 2008, if this is a public work contract covered by Article 8 of the Labor Law, the contractor understands and agrees that the filing of payrolls in a manner consistent with Subdivision 3-a of Section 220 of the Labor Law shall be a condition precedent to payment by the State of any State approved sums due and owing for work done upon the project. Without submittal of certified payroll record/s, payment will not be made. Service-Disabled Veteran-Owned Set Aside: No Minority Owned Sub-Contracting Goal: 30% Women Owned Sub-Contracting Goal: 7% Service-Disabled Veteran-Owned Business Contracting Goal: 6% 1. Contractor is responsible for complete demolition and disposal of construction garbage. Rip out floor tile, subflooring, drywall etc 2. Repair flooring: Contractor shall provide proper support for new subflooring. All deteriorated mod members (studs and joists) shall be replaced in kind' sister joisted as additional structural support. Floor drain is to be relocated closer to the shower and the floor must be pitched properly towards the drain. Contractor is responsible for providing pictures as proof 3. Install % inch plywood. Plywood is to be glued and screwed to floor joists. Paint the plywood with sealer install waterproof liner that is to be continuously running on all walls at least 1 foot with no cuts to the liner, then cement board. 4. Contractor is to install Porcelain floor tile (Unglazed finish) 12" X 12" Daltile Hastings Gray 12 in. x 12 in. Unglazed Porcelain Floor tile (or equivalent) 5. Replace and install new shower footing , Contractor is to connect new plumbing, shower body and shower head. Deltaln2ition Two-in-One 5-Spray 6.8 in. Dual Wall Mount Fixed and Handheld Shower Head in Brushed Nickel. 6. Installation of the new toilet. Contractor must provide new wax ring and toilet flange 7. Contractor is to install new drywall and cement board around the shower tape and plaster walls. 8. Contractor is to install a new 90 min fire rate door and frame. Path up to hallway drywall and paint 9. Wall tile is to be installed on all walls from floorto ceiling. Contractor to use Porcelain glazed tile Home Decorators Collection Kolasus White 12 in. x 24 in. Matte Porcelain Wall Tile 10. Contractor is responsible to Paint and plaster the ceiling. 1 coat of primer and 2 coats of white semigloss ceiling paint. 11. Provide and install new light fixture 12. Contractor to provide a new all wood vanity sink, faucet, new plumbing and water hoses, medicine cabinet, New ceiling vent cover. 13. Install New ADA compliant Grab bars around shower area and the toilet. Grab bars are to be secured to the studs or wooden block must be installed for the proper support. 14. Contractor to install a new stone (quartz) door threshold 15. All floor and wall tiles are to be grouted; Clear Silicone is to be applied all around shower as a second coating upon grout curing. 16. Contractor must provide 2 cases of wall and floor tile as a spare. Please note, vendors must remain for the mandatory site visit in its entirety in order to ask questions regarding the specifications of this project. Leaving the site visit early will cause you to be ineligible to submit a quote. Any vendor questions not asked during the site visit must be submitted in writing to: Brooklvn.CMM.Bids@opwdd.ny.gov (within two business days of the site visit: July 29, 2022). Both questions and answers (if any) will be provided to all who attend the site visit via email by: August 3, 2022.The Metro DDSOO Maintenance point of contact for this project is Daniel McCarthy at Daniel.McCarthy@opwdd.ny.gov.

Final Planning

Residential Subdivision

$40,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
512
Active Projects
305
Bidding Soon
4,588
All Active Projects
2,066
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.