Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 4, 2026 at 7:00 PM
Updated February 5, 2026
Demolition, site work, renovation and addition to a mixed-use development in Barron, Wisconsin. Working plans call for the addition of a medical facility; for site work for a medical facility; for the demolition of a medical facility; and for the renovation of a medical facility.
As of February 4, 2026, this project is in the design stages. It may be issued to bid for subcontractors in May 2026. Construction is slated to begin in August 2026. Contractor" is all contractors working on a project regardless of contractual relationship. This includes the General Prime Contractor (GPC), MEP Subcontractors, Non-MEP Subcontractors, and all Subcontractors, regardless of tier of subcontract. "Mechanical, electrical, plumbing and fire protection subcontractor" ("MEP Subcontractor") is a contractor that performs mechanical (Heating, Ventilating, and Air Conditioning), electrical, plumbing, or fire protection (fire suppression) work for the Project and enters into a contract with the Construction Manager to perform their division of work. *The closed solicitation has been included below for reference: Project Intent This project seeks to modernize the Wisconsin Veterinary Diagnostics Laboratory-Barron (WVDL-Barron), Wisconsin to create a modern scientific facility that meets the laboratory and space needs of the University and the State of Wisconsin, Department of Agriculture, Trade and Consumer Protection (DATCP). The intent is to construct improvements to allow the WVDL-Barron to remain operational during the course of the project.
Pre-Construction/Negotiated
Medical
$14,555,000.00
Public - State/Provincial
Addition, Demolition, Renovation, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
4
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 7, 2025
August 3, 2026
1521 Guy Ave, Barron, WI
Related To This Project
Barron, WI
Bid Date: Apr 12 2022
Barron, WI
Bid Date: Mar 30 2021
Barron, WI
Bid Date: Aug 16 2022
Barron, WI
Bid Date: Sep 14 2022
Barron, WI
Bid Date: Feb 16 2023
Barron, WI
Bid Date: Jun 09 2023
Barron, WI
--
Barron, WI
Bid Date: Jan 11 2022
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
