BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Mobile, Alabama. Completed plans call for the renovation of a municipal facility.

Include the furnishing of all labor, materials, tools and equipment necessary to carefully remove existing temporary signage and provide and install new ADA Interior Signage A Cashier's Check drawn on an Alabama bank or Bid Bond payable to Owner, City of Mobile, in the amount of 5% of the Base Bid, but in no event more than $10,000.00 is required to accompany Bid For contracts that exceed $10,000.00, a Bid Bond (or Bid Security), Performance Bond and a Labor and Material Payment Bond shall be required All work operations shall take place in the identified areas during the week, and during designated weekends if agreed upon in advance. Debris shall be removed from the site at the end of each work day. Adjacent surfaces and hallway areas shall be protected and kept dirt/debris free for the duration of the project. Thoroughly clean these areas at the end of each work day. Contractor shall coordinate all work sequences with the Project Manager and end-user representative to minimize disruption of employee work activities. Quoters are required to participate in the Pre-Quote Conference, visit the site prior to submitting a Quote, and include all costs associated with the project in their Quotes. This project is tax exempt. Summary of Work: Include the furnishing of all labor, materials, tools and equipment necessary to carefully remove existing temporary signage and provide and install new ADA Interior Signage as outlined in this RFQ document. All work operations shall take place in the identified areas during the week, and during designated weekends if agreed upon in advance. Debris shall be removed from the site at the end of each work day. Adjacent surfaces and hallway areas shall be protected and kept dirt/debris free for the duration of the project. Thoroughly clean these areas at the end of each work day. Contractor shall coordinate all work sequences with the Project Manager and end-user representative to minimize disruption of employee work activities.

Award

Municipal

$10,474.00

Public - City

Renovation

7

4

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
64
Active Projects
38
Bidding Soon
491
All Active Projects
205
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 24, 2022

July 25, 2022

img_map_placeholder

205 Government St, Mobile, AL

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.