BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Chilliwack, British Columbia. Completed plans call for the renovation of a educational facility.

.1 Provide new, complete, operational and tested mechanical systems for ventilation and controls systems, as described herein, indicated on the drawings and in full conformance with applicable codes, standards and ordinances. .2 Provide all labour, materials and products as specified, as required to accomplish this work. .3 The scope of HVAC work for this project generally includes: .1 Dust Collectors and associated safety devices .2 Gas fired make-up air units .3 Supply and exhaust air ductwork - high pressure and low pressure .4 Mechanical insulation (duct) .5 Blast gates (manual, none-adjustable) .6 Automatic Blast Gate Systems .7 Condensate Drainage Piping .8 Natural gas piping .9 Compressed Air Piping .10 Air systems balancing and measurement .11 Verification of systems operation and controls .4 Demolition and builder's work will include the following: .1 Demolition, painting, remediation, etc, as described in the specifications and on the drawings, to accommodate the Work. .2 Roofing .3 Construction of new sanding table .4 Concrete removal and replacement .5 Non-structural seismic protection .5 Structural Steel work will require the following: .1 Dust collector retrofits to install new safety devices and modify the existing enclosures to suit the new safety devices. .2 Steel framing below new make-up air units for support of the units and associated duct openings. .5 Electrical work will require the following: .1 Electrical power supply to mechanical equipment .2 New contactor panels for tool control from BMS system .3 Revisions to emergency stop system as required for new scope. .4 Start/stop buttons at tools connected to dust collection system .5 Wiring of line voltage relays and contactors as required to suit automatic gate system sequence of operations .6 Fire Alarm interconnection. .1 Coordinate with fire alarm service provider to connect dust collector to the fire alarm system. Dust collector is to shut down in case of fire alarm, refer to electrical drawings. .2 Installation shall be subject to inspection of the local Building Inspector and the local Fire Department. .7 The mechanical contractor shall act as the Prime Contractor for this project, responsible for the coordination of all trades required to carry out the work as described herein.

Award

Educational

$799,000.00

Public - State/Provincial

Renovation

11

10

11

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
62
Active Projects
23
Bidding Soon
1,375
All Active Projects
550
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 29, 2022

June 30, 2022

img_map_placeholder

45955 Thomas Rd, Chilliwack, BC

The best commercial construction leads in the industry. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.