BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and addition to a mixed-use development in Milan, Missouri. Completed plans call for the addition of a 5,500-square-foot educational facility; for the demolition of a educational facility; for site work for a educational facility; water / sewer project; warehouse / distribution facility; warehouse / distribution facility; and warehouse / distribution facility.

All work to be one contract under a General Contractor. The Owner reserves the right to reject any and all bids and to waive irregularities. Wage Determination: Annual Wage Order No. 29 for Sullivan County. The Wage Order has been issued by the Missouri Division of Labor Standards. The project consists of an Elementary Addition to Milan C-2 School (approx. 5,500 s.f.). The addition will include four (4) classrooms, restrooms, and storage. Construction will be load bearing steel framing with steel bar joists and decking with a membrane roofing material. Interior walls metal stud framing. There will be associated extensions of existing sewers, water, and electric services. There will be some related site work, including concrete walks. The Milan C - 2 School District reserves the right to reject any or all bids and to waive any informality or technicality therein. 5% Bid Bond required; 100% Performance and Material Payment Bond required of the Contractor awarded the work. It is the bidder's responsibility to deliver his proposal at the proper time, to the proper place. The Owner reserves the right to reject any and/or all bids, to waive any informalities, and to award the work to the lowest, responsible Bidder. The Contract will be awarded to the lowest bidder complying with the conditions of the Bid Documents and Contract Documents, providing the bid is reasonable and to the best interest of the Owner to accept it. The Owner reserves the right to reject any and all bids and to waive any irregularities. In determining the lowest Responsible Bidder, the following elements will be considered: Has suitable financial status, technical experience, adequate personnel to perform the work properly and expeditiously, prior experience with similar projects, history of successful, projects and timely completion, compliance with State and Federal Laws, contractor proximity to project for warranty work, other essential factors as pertinent to the specific project. The owner reserves the right to accept any combination of Base Bid and requested Alternates (if any) and accept them in any order. Upon request and within two (2) hours after the Bid, the Bidder shall submit to the Architect a properly executed Contractor Qualifications Statement - AIA Form A305 along with a list of SubContractors/Suppliers. Work shall commence immediately upon execution of the contract and shall be substantially completed on/or before the date as stated on the Bid Form by the Contractor and agreed upon by the Owner. Note that the Bid Form states the Completion Date for the Contract. See Division 00130 for Construction Schedule for various portions of the project. Liquidated Damages will be assessed for delay. See 8.3.4 of Supplemental Conditions. If the work embraced by this Contract is not completed on or before the date as stated by the Contractor in their bid or any approved extensions thereof, the actual damages for the delay will be impossible to determine and in lieu thereof, the Contractor shall pay to the Owner as fixed, agreed liquidated damages for each calendar day of delay until the work is satisfactorily completed and accepted by the Owner, a fixed and agreed amount as follows: $1000.00 per day. Contractor is to name the number of calendar days for Construction on the Bid Form. See Construction Schedule - Division 002415. This date will be binding and Liquidated Damages will begin with the agreed date plus any agreed extensions. Requests for Extensions of Time to be included with each Pay Certificate and approved by the Architect and Owner. If said request is not approved or no request is made it will be assumed that there is no extension of time as of the date of the most recent approved Pay Request. Note that any milestone dates listed for portions of the work are also subject to the liquidated damages listed above - See Section 002415 Construction Schedule

Bid Results

Educational

$1,629,000.00

Public - State/Provincial

Addition, Demolition, Site Work

32

30

2

3

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
45
Active Projects
14
Bidding Soon
356
All Active Projects
102
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

December 15, 2022

December 21, 2022

December 21, 2023

img_map_placeholder

373 S Market St, Milan, MO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.