Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Glendale, Arizona. Contact the soliciting agency for additional information.
Project Name: 6 Intersections in Glendale, Install Flashing Yellow Arrows Project (TRACS) Number: T0349 01D District: Central Route/MP: Various Intersections Funding Source: Federal Construction Funding FY: 2023 The project scope includes the following: Installation of the flashing yellow arrow (FYA) protected/permissive phasing for six intersections within the City of Glendale. Additionally, a 3-inch retroreflective yellow tape will be installed on the all the signal heads at the six intersections. The locations are as follows: Bell Rd and 63rd Ave, Northern Ave and 56th Lane, Northern Ave and 47th Ave, Olive Ave and 47th Drive, Olive Ave and 55th Drive, and 67th Ave and Butler Drive. Three of these intersections (63rd Ave at Bell Rd, Northern Ave at 56th Lane, and Northern Ave at 47th Ave) currently have protected/permissive phasing and will be replaced with FYA signal heads, and pavement marking improvements will be made to eliminate negative offset for the left-turn lanes.For the remaining three intersections (Olive Ave at 47th Drive, Olive Ave at 55th Drive, and Butler Drive at 67th Ave), there is no exclusive left-turn phasing for the left-turn movement from the major arterial. The crashes at these intersections warrant left- turn phasing for left-turns from the major arterial. For these intersections, FYA protected/permissive phasing and pavement marking improvements to eliminate negative offset will be installed. For the remaining three intersections (Olive Ave at 47th Drive, Olive Ave at 55th Drive, and Butler Drive at 67th Ave), there is no exclusive left-turn phasing for the left-turn movement from the major arterial. The crashes at these intersections warrant left- turn phasing for left-turns from the major arterial. For these intersections, FYA protected/permissive phasing and pavement marking improvements to eliminate negative offset will be installed. Scope of Work: The consultant shall prepare preliminary and final construction documents, supporting documents, and all clearances necessary to bid and award the project for construction. The services shall include but are not limited to: Project Management, Agency Coordination, Site Visits, Survey/Control/Base Map Preparation, Geotechnical/Materials Report, Utility Data Acquisition and Coordination, Environmental Analysis, Cost Estimates, Schedules, Construction Phasing, and Traffic Control. Information provided in the Project Establishment Letter will be used as the basis for the final scope of work. Questions, in writing, shall be received by ECS at the below email address until 06/08/2022 at 2:00 P.M. (Arizona Time). No further questions shall be accepted after the time specified. The method of contractor selection has not been determined at this time. AZ DOT - RFQ - Project Development On-Call - 6 Intersections in Glendale, Install Flashing Yellow Arrows
Conceptual
Roads / Highways
Public - State/Provincial
Service, Maintenance and Supply
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 13, 2022
Multiple Locations, Glendale, AZ
Related To This Project
Glendale, AZ
--
Glendale, AZ
Bid Date: Mar 09 2023
Glendale, AZ
Bid Date: Nov 30 2022
Glendale, AZ
--
Glendale, AZ
--
Glendale, AZ
Bid Date: Apr 13 2022
Glendale, AZ
Bid Date: Apr 14 2022
Glendale, AZ
--
Glendale, AZ
Bid Date: Apr 05 2022
Glendale, AZ
Bid Date: May 05 2022
Glendale, AZ
Bid Date: Mar 15 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.