Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 1, 2025 at 8:00 PM
Updated April 2, 2025
Renovation of an educational facility in Buffalo, New York. Completed plans call for the renovation of a 73,630-square-foot, three-story above grade educational facility.
**As of February 20, 2025 the project has not been awarded yet. The timeline for award has not yet been established.** All work on this Contract is to be completed by August 14th, 2026, starting on or after the University's Notice to Proceed is received which shall be forwarded to the Contractor(s) upon approval of the contract of the New York State Comptroller The State University of New York reserves the right to reject any or all bids. The Work shall be conducted in two (2) phases, with each phase substantially complete as indicated: 1. Phase 1 scope include full renovation of first floor including exterior windows. Exterior sidewalk replacement, Second floor window replacement complete with related interior scope with associated mechanical and electrical work. Third and fourth floor balancing of mechanical systems for existing toilet rooms. Work of this phase shall commence May 19th 2025 and be substantially complete and ready for occupancy May 18th 2026. 2. Phase 2 scope is specific to Alternate Bid #1 referred to specification section 012300. This alternate scope includes additional window replacement work and associated repairs. Work of this phase shall commence May 18th and be substantially complete and ready for occupancy August 3rd 2026. General: Cooperate fully with Owner so work may be carried out smoothly, without interfering with or delaying work under this Contract or work by Owner. Coordinate the Work of this Contract with work performed by Owner. B. Preceding Work: Owner will perform the following construction operations at Project site. Those operations are scheduled to be substantially complete before work under this Contract begins. 1. Removal of existing office and library furniture 2. Removal of library bookshelves. 3. Removal of halon fire suppression system. 4. Exterior masonry repointing and cleaning C. Concurrent Work: Owner will perform the following construction operations at Project site. Those operations will be conducted simultaneously with work under this Contract..
Award
Educational
$2,724,000.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 13, 2025
May 19, 2025
Multiple Locations, Buffalo, NY
Related To This Project
Buffalo, NY
Bid Date: Jun 07 2022
Buffalo, NY
Bid Date: Jun 20 2022
Buffalo, NY
Bid Date: Jun 21 2022
Buffalo, NY
Bid Date: May 06 2022
Buffalo, NY
Bid Date: May 06 2022
Buffalo, NY
--
Buffalo, NY
Bid Date: Jun 21 2022
Buffalo, NY
Bid Date: Jun 21 2022
Buffalo, NY
Bid Date: Jul 30 2024
Buffalo, NY
Bid Date: Apr 22 2022
Buffalo, NY
Bid Date: Jun 14 2022
Buffalo, NY
Bid Date: May 20 2022
Buffalo, NY
Bid Date: Apr 22 2022
Buffalo, NY
Bid Date: Jun 14 2022
Buffalo, NY
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
