BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Victoria, British Columbia. Completed plans call for site work for a water / sewer project.

The works to be constructed under this Contract generally include, but is not limited to, the following: Construction and installation of two (2) - 4m x 3m floating maintenance platforms to allow CRD staff to perform maintenance on the water intake screen heads at both Buck Lake and Magic Lake located on Pender Island. This work includes the purchase and installation of all platform, winch system and anchoring components\materials. Modification to the existing Magic Lake water intake line is required. This task includes purchase and installation of all hose, pipe, fittings and materials required to modify the existing water intake from a fixed pipe with screen head to a flexible pipe configuration allowing the screen head to be raised proud of the water surface for maintenance. Issued for Tender (IFT) design drawings with specifications are included in this Invitation to Tender (ITT). Removal and disposal of one existing platform located on Buck Lake is required. The existing floating platform is a decaying cedar wood plank deck that sits on two 'Enviro-Floats'. The deck area measures 2.6m x 1.7m and includes a mounted hand winch. The platform is anchored to the lake by two large precast concrete weights with two 300mm diameter x 1.3m long, 500lb counterweights as stabilizers. The concrete weights may be abandoned but may need to be moved so they do not interfere with the new platform anchoring installation. All other platform and anchoring components and materials are expected to be removed from the site. No existing components are to be reused. Refer to CRD Record Drawing 27-D239-1 for details. Diver work is expected in the installation of the platforms, removal of the existing Buck Lake platform and its anchoring system and for modification of the Magic Lake water intake. The existing Buck Lake water intake line does not require any modifications. The work will include production of shop drawings. Record drawings will be produced by the consulting engineer with the contractor expected to provide red-line markups detailing any changes to the construction drawings. Production of an Operation and Maintenance (O&M) Manual is not required. The consulting engineer will produce the O&M Manual with the contractor expected to provide all relevant equipment lists, manuals, safety data sheets (SDS), etc. required to complete the O&M manual. Documents can be obtained from www.crd.bc.ca/about/contracts-rfps/ Award amount was not released for publication.

Award

Water / Sewer

$500,000.00

Public - County

Site Work

7

7

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
145
Active Projects
53
Bidding Soon
2,005
All Active Projects
813
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.