BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 26, 2022 at 8:00 PM

Updated September 14, 2023

Site work for an educational facility in Wentzville, Missouri. Completed plans call for site work for a educational facility.

The purpose of this Request for Bid (RFB) is to select one vendor for one (1) new LED SIGN with wireless/remote communication for Holt High School to be delivered and installed by the vendor. Removal of existing changeable copy board will be required. The hook up to electrical will be provided by the District. Service labor must include all costs to remove existing changeable copy board, delivery, and installation of new LED Sign at the existing site at Holt High School, 600 Campus Drive, Wentzville, MO 63385. Request for Additional Information/Questions Date: August 5, by 1PM CST

Post-Bid

Educational

$80,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
210
Active Projects
116
Bidding Soon
1,322
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 12, 2022

September 12, 2022

Project location map

600 Campus Dr, Wentzville, MO

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.