BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Gridley, California. Completed plans call for the renovation of a municipal facility.

California Construction Authority is soliciting bids from B licensed contractors for the following public works project at the Butte County Fairgrounds in Gridley, CA: Material and labor to upgrade kitchen. To include fixtures, lighting, finishes, etc. Engineer's Estimate: $350,000.00 The below scope of work to include a brief summary and not intending to be encompassing of project entirety: 1. Create accessibly compliant entries to the building. 2. Demolish flooring and existing electrical power and lighting. Remove directconnection from 3-compartment sink. Demolish existing range, serving counters, wall shelving, and walk-in shelving. Remove existing soda dispensing and ice wells in serving counter and associated plumbing and electrical. 3. Install mop sink and hand sink at both sides. Relocate soap and paper towel to hand sink. 4. Replace flooring and bases in entirety, serving counters, wall shelving, and provide racking at walk-ins and kitchens. 5. Provide new range under existing hood (replacement matches original size and clearances) no work at hood or extinguishing system. 6. Provide new self-contained freezer, ice machine/bin, and prep sink to east kitchen. Install required floor sinks. 7. Provide all new LED lighting throughout (interior/exterior). 8. Provide all new power outlets. 9. Provide routing for existing roof condensate lines to be wasted into new floor sinks at 3-compartment sinks. 10. Change swing of entry doors. Remove security doors. Install closer and panic hardware. 11. Install FRP where shown on plans. Stainless steel to remain. Paint remainder of walls and ceiling in white semi-gloss paint 12. All work is to be conducted around Fair activities. The Contractor is to provide a minimum of 48 hours' notice of the shutdown of any utilities to both CCA and the Fair. If shutdown of water supply impacts any fire hydrants or sprinklers, shutdown to be coordinated with local fire department. Utility shutdown time is to be kept at a minimum and be back online at end of each workday. 13. Addition as yet undetermined work may be identified. Any additional work will be conducted in accordance with Potential Change Order (PCO), presented in the General Conditions (Appendix C). 14. All work is to comply with all current applicable California Codes. 15. All work to be warrantied (materials and labor) for a minimum of one (1) year, or manufacturer period, whichever is greater.

Bid Results

Municipal

$489,750.00

Public - State/Provincial

Renovation

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
36
Bidding Soon
678
All Active Projects
250
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 15, 2022

June 28, 2022

img_map_placeholder

199 E Hazel St, Gridley, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.