Site work and new construction of a municipal facility in Poy Sippi, Wisconsin. Completed plans call for the construction of a 4,241-square-foot municipal facility; and for site work for a municipal facility.

The project consists of a new 4,241 sqft single story, wood framed building with vinyl siding and shingle roof. The Contractor shall be considered in default of the Contract and such default will be considered as cause for the Owner to terminate the Contract for any of the following reasons if the Contractor: 1. Fails to begin the Work under the Contract within the time specified in the Construction Schedule. 2. Fails to perform the Work or fails to provide sufficient workers, equipment, or materials to assure completion of Work in accordance with the terms of the Contract. 3. Performs the Work unsuitably or neglects or refuses to remove materials or to perform anew such Work as may be rejected unacceptable and unsuitable. 4. Discontinues the prosecution of the Work. 5. Fails to resume Work which has been discontinued within a reasonable time after notice to do so. 6. Becomes insolvent or is declared bankrupt or commits any act of bankruptcy or insolvency. 7. Allows any final judgment to stand against them unsatisfied for a period of 48 hours. 8. Makes an assignment for the benefit of creditors. 9. Is determined to be in violation of the provisions of the Contract relative to hours of labor, wages, equal opportunity, character and classification of works employed 10. For any other cause, fails to carry on acceptable Work.

Post-Bid

Municipal

$1,500,000.00

Public - County

New Construction, Site Work

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
59
Active Projects
2
Bidding Soon
994
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 7, 2022

July 28, 2022

Project location map

N4250 State Road 49, Poy Sippi, WI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.