Renovation of a playground / park / athletic field in Lincoln City, Indiana. Completed plans call for the renovation of a playground / park / athletic field.

Award Details Contract Award Date: Jul 26, 2022 Contract Award Number: 140P6222P0044 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: NAG9TNWMM5Q6 Contractor Awarded Name: JVS CONSTRUCTION, INC. Contractor Awarded Address: Bloomfield, IN 47424-4773 USA Base and All Options Value (Total Contract Value): $65840 Project Description: This is a request for quotations for construction prepared in accordance with the format in the Federal Acquisition Regulations (FAR) Part 13 and Part 36, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation issued as Request for Quotation (RFQ) 140P6222Q0020. FAR clauses and provisions enclosed within this RFQ are those in effect through Federal Acquisition Circular (FAC) 2022-06 and are available in full text through Internet access at https://www.acquisition.gov. Type of Contract: Construction, Firm Fixed Priced (FFP), Single Award Contract County: Spencer County, Indiana Type of Construction: Building Magnitude: Between $25,000 and $100,000 NAICS: 236220, Commercial and Institutional Building Construction SIZE STD: $39.5M SET-ASIDE: Total Small Business National Park Service Contracting Officer (CO) Name: Cecilia Mitchell Email: cecilia_mitchell@nps.gov Lincoln Boyhood National Monument has a requirement for the refurbishing of two bathrooms. See Attachment 01 for specifications. A site visit is scheduled for 06/15/2022 at 1000 CD. To submit a quote, see Section L - Instructions to Offerors. All quotes must be submitted by email to cecilia_mitchell@nps.gov. Direct all questions regarding this RFQ to cecilia_mitchell@nps.gov by 1400 CD on 06/24/2022 PERIOD OF PERFORMANCE (Reference 52.211-10) Notice to Proceed will only be issued upon receipt of acceptable bonding and insurance. All onsite work is estimated to be performed: September 5, 2022 - December 5, 2022 Work consists of: The project will consist of refurbishing the bathrooms to make them accessible. As the footprint (SF) of each bathroom will not change, work requiring floor or wall demolition is not expected. Much of the bathroom refurbishment will be fixture replacement and upgrades. While each bathroom is not identical, the work processes will closely align for each bathroom. The major difference is the men's room has two toilets and a urinal; the ladies room has a third toilet in lieu of a urinal. All fixtures and installations will meet ABA requirements as much as possible. The Memorial Visitor Center (VC) will remain open during the refurbishment, alternate bathroom facilities will be available. The Contractor should refer to Divisions 10, 22, and 26 for specific information detailed below. The Contractor will verify dimensions and quantities before beginning any work to include ordering materials. Potential contractors are highly encouraged to perform a site visit before engaging in the bidding process. 1. Both (2) bathroom doors will be removed. Each door opening will be widened to accept a 36" wide door. New metal doors to be installed to ABA Standards, repair openings to match existing finishes. 2. Each bathroom entry door will have ABA approved interior and exterior push button activated entry systems installed. 4 total plates to be installed. The 2 bathroom doors will have stationary handles and kick plates (4 total each). 3. Motion activated lighting systems will be installed in each bathroom. Approx. 2 light fixtures per bathroom (4 total). 2 wall mounted lights and 2 12" round recessed light fixtures total. Both fixtures should be wired for replaceable LED light bulbs. 4. Timer activated fan venting systems will be replaced. 1 fan per bathroom (2 total). Fan lighting not required. Use existing locations. 5. The 2 bathrooms will have single counter, double bowl sinks installed. A "corian" type material is desired, sinks and counter molded as one unit. The 4 faucets will be motion activated and new supply lines (8 - flex metal) and traps (4 - metal, chrome) installed. Two hand soap dispensers per sink will be included in the handwashing stations (4 total hand soap dispensers). 6. All exposed under-sink piping (supply lines and traps) will be replaced. New piping will have "soft-covered" ABA approved protection devices installed. (8 supply lines, 4 traps total) 7. The 2 mirrors will be upgraded (changed) to a stainless steel, canted ABA approved style. No counter required. 8. The 2 wall mounted trash dispensers will be removed, and the wall tile repaired. 2 self-standing metal trash containers with swing lids to be supplied by contractor. COR will specify can heights and style, contractor to quote for 33 gallon bags. 9. One toilet in each bathroom will be removed to facilitate an accessible stall in each bathroom. Total of 2 toilets to be removed and drains sealed. The drains will be sealed using a pipe plug and covered with concrete. Sealant will be applied over the concrete plug. Tile replacement is not necessary. 10. All toilet stalls (doors and walls) will be replaced (2 stall sets total) with Phenolic Core bathroom stall sets. Floor and wall tile penetrations will be repaired. New stalls will meet ABA accessibility requirements. Install grab bars (minimum 4 total) and coat hooks (3). Contractor to verify dimensions before beginning work. 11. New ABA approved floor mounted, elongated bowl toilets and seats will be installed. 3 each total. Contractor will install new supply lines and drain material (wax rings, bolts, caps, etc.). Toilet seats will be commercial grade plastic with metal hardware. 12. ABA approved opening handles and locks will be installed in the accessible stalls. 3 stalls with door openings total. Handles and locks to be metal chromed. 13. New Diaper Changing Stations will be installed in each accessible stall. (2 total). Must be ABA compliant with belts and cleanable. 14. New identification signs will be installed for each bathroom. 2 total, ABA compliant. 15. Replace old water heater and replace with 1 new "instant heat" water heater system. The existing instant hot system will removed, and in the same location the new WH will be installed in the custodial closet located in-between the bathrooms. The water heating system will supply both bathrooms and the custodial closet sink. Use existing plumbing and electrical wiring. Contractor to verify size and dimensions before beginning work. 16. Non-tiled (paintable) surfaces such as the ceilings and walls will be repainted with washable acrylic based paint. The park will designate the finish and color(s). Approximately 500 SF. The tile floor (approx. 400 SF) will be resealed with acrylic ceramic tile sealer after all fixture installation and wall/ceiling work is completed. Match two entry door installations to current and final finishes. 17. All questions pertaining to the information listed in these work specifications should be directed to the Project COR *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Playgrounds / Parks / Athletic Fields

$65,840.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
74
Active Projects
23
Bidding Soon
575
All Active Projects
232
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 7, 2022

September 5, 2022

img_map_placeholder

3027 E S St, Lincoln City, IN

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.