BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Urbana, Illinois. Design plans call for the renovation of a educational facility.

As of June 13 2024 this is in design developemnt still and on hold. Information regarding a timeline for contractor bidding and construction have not been determined. *The closed solicitation has been included below for reference: The Capital Development Board (CDB) requests qualifications from Construction Management firms to provide Construction Management Services at Agency Professional Services in connection with the above project. Firm acting as a Construction Manager (CM) must be pre-qualified with the Capital Development Board as a CM. A combined MBE/WBE goal of 20 percent is applicable to the team. Some level of participation from both MBE and WBE firms is required to satisfy this goal (this requires including one or more MBE AND one or more WBE firms on the team). A VBE/PBE goal of 3 percent is applicable to the team. Final approval of selection of the Construction Manager is scheduled for the March 8, 2022, CDB Board meeting. The interviews for this project are tentatively scheduled for February 22, 2022. The scope of work provides for a complete restoration of the existing Altgeld Hall and replacement of Illini Hall with a new facility in its location for the Departments of Mathematics and Statistics, as well as providing a hub for the creation site for an incubator for data science on the campus. Hazardous materials may be encountered. The State Historic Preservation Office should be consulted during every phase of this project. The project consists of four phases. The facility must be designed and constructed to meet the minimum of LEED Platinum Certification. Commissioning will be provided by the Construction Manager for Phase 3 and Phase 4. Estimated Total Project Budget: $192,000,000. The method of Contractor Selection has not been Determined at this time *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Design

Educational

$40,000,000.00

Public - State/Provincial

LEED Certification, Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
70
Active Projects
29
Bidding Soon
488
All Active Projects
238
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 16, 2024

img_map_placeholder

1409 W Green St, Urbana, IL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.