Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 4, 2025 at 8:00 PM
Updated August 5, 2025
Renovation of a museum in Cleveland Hts, Ohio. Completed plans call for the renovation of a museum.
Museum facilities will remain open throughout the renovation of the Cleveland Museum of Art's main entrance and lobby areas. (Rendering courtesy of the Cleveland Museum of Art) The Cleveland Museum of Art attracted about 500,000 visitors in 2005, the same year it began a $320 million expansion that eventually doubled its exhibition space. New programming and presentations have increased attendance, to the tune of 650,000 guests last year and 685,000 thus far in 2024. A surge in attendees also created a problem, albeit a good one, said CMA chief marketing officer Todd Mesek. Put simply, the museum's lobbies became congested, creating pinch points for larger crowds and negatively impacting the visitor experience. ADVERTISEMENT CMA's lobby dilemma now has a solution, thanks to a pending $8 million renovation of two well-trafficked spaces - the main entrance on East Boulevard and a lobby area on the facility's lower level. "Knowing traffic patterns changed because of the initial expansion, we wanted to make sure we're putting our audience at the center of the conversation," said Mesek. Ideally, the reconfigured spaces will deepen guest engagement, create new educational opportunities, and better utilize the museum's overall growth, Mesek added. For example, a digital wayfinding display will replace the current ticketing desk in the upper lobby, giving visitors an easy-to-read guide of daily tours, art rotations and new exhibitions. Further modifications include LED lighting and streamlined security systems, with a new art installation transitioning visitors from the outdoors into a realm of beauty and creativity. "Everything will stay open during the renovations, which has always been the focus," said Mesek. "As we bring more people through our doors, we want the initial experience to be welcoming, positive and efficient." New amenities and a refreshed space are in store for the Cleveland Museum of Art's lower lobby. (Rendering courtesy of the Cleveland Museum of Art) Meanwhile, the lower lobby will become a multi-disciplinary learning space for student groups and other large tours, complete with a coat check and dedicated reception area. Changes will emphasize an Education Art Collection composed of 10,000 cultural heritage objects - the update will further build upon a CMA tradition of making art accessible and meaningful to diverse audiences, Mesek said. Construction of both spaces, which began in early May, is scheduled for completion at the end of October. The work will not alter the lobby entrances' brutalist style, as designed by Hungarian-American architect Marcel Breuer. "There are two important guiding principles for the lobby renovation," said CMA director and president William Griswold in a press release in April. "The first is to respect and preserve Breuer's historic, architecturally significant design. The second is to address the needs of our guests. With this project, the CMA looks to the future, while staying true to and respecting the past." Museum board chair Ellen Stirn Mavec spearheaded the plan's $8 million gift, through leadership challenge dollars from The Kelvin and Eleanor Smith Foundation. Additional foundation contributions along with funding from the State of Ohio's capital budget further bolstered the project. Mesek views the lobby upgrades as the final piece of CMA's mid-aughts renovation efforts. Drawing 100,000 students annually is only one goal for a Cleveland institution that exists to spark curiosity and inspire exploration, he said. "What we know from visitors and the trends that we've seen, it's about meeting those needs now while preparing for growth," said Mesek. "We're paying off (with these upgrades) what we've already done." _____________________________________________________________ A detailed scope has not yet been determined. This project is in included in the State of Ohio - Administrative Services FY 2022-2023 Capital Improvement Plan (CIP). As of October 13, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Under Construction
Museum
$750,000.00
Public - State/Provincial
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 2, 2023
11150 East Blvd, Cleveland Hts, OH
Related To This Project
Cleveland Hts, OH
--
Cleveland Hts, OH
--
Cleveland Hts, OH
Bid Date: Sep 16 2022
Cleveland Hts, OH
Bid Date: Oct 05 2022
Cleveland Hts, OH
--
Cleveland Hts, OH
--
Cleveland Hts, OH
--
Cleveland Hts, OH
Bid Date: Feb 07 2025
Cleveland Hts, OH
--
Cleveland Hts, OH
--
Cleveland Hts, OH
Bid Date: Nov 02 2022
Cleveland Hts, OH
Bid Date: Nov 04 2022
Cleveland Hts, OH
--
Spring Valley, OH
Bid Date: Oct 27 2022
Dayton, OH
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.