BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of an educational facility in Santa Ana, California. Completed plans call for the renovation of a educational facility.

Contractors License Classification. Bidders must possess the following classification(s) of California Contractors License at the time that the Bid Proposal is submitted and at time the Contract for the Work is awarded: C-39 Roofing. The Bid Proposal of a Bidder who does not possess a valid and in good standing Contractors License in the classification(s) set forth above will be rejected for non-responsiveness. Any Bidder not duly and properly licensed is subject to all penalties imposed by law. No payment shall be made for the Work unless and until the Registrar of Contractors verifies to the District that the Bidder awarded the Contract is properly and duly licensed for the Work. 2. Contract Time. The Contract Time is 180 calendar days from date of Notice to Proceed to Final Completion. A Bid Proposal submitted by a Bidder whose representative(s) did not attend the entirety of the Mandatory Job Walk will be rejected by the District as being non-responsive. Visitor parking stalls may be utilized for the duration of the job walk, if available. (Lot 3 at Santa Ana College and Lot 6 at Santiago Canyon College). No day parking permit is required for the job walk. 4. Submittal of Bid Proposals. All Bid Proposals must be submitted on forms furnished by the District prior to 2:00 P.M., Thursday, June 30, 2022 , the last time for submission of Bid Proposals and the District s public opening and reading of Bid Proposals. Submit Bids to RSCCD Facility Planning, District Construction and Support Services at 2323 North Broadway, Suite 112, Santa Ana, CA 92706. Bidders are solely responsible for timely submission of Bid Proposals to the District at the designated location. The District shall not be responsible for any delays or issues with mail delivery. Any bid received after the scheduled closing time for receipt of bids shall be returned to the bidder unopened. Contract Documents are available to all Bidders online at the District website, no later than 5:00 P.M . on Tuesday, May 31, 2022 . The Bid and Contract Documents may be available from sources other than the Purchasing Webpage, including plan rooms. The District is not responsible for the accuracy or completeness of Bid or Contract Documents obtained from any source other than the Purchasing Webpage. Bidders are solely responsible for the risk of inaccurate or incomplete Bid or Contract Documents obtained from any source other than the Purchasing Webpage. 6. CUPCCAA . This Project is being let in accordance with the California Uniform Public Construction Cost Accounting Act ( CUPCCAA ) set forth in Public Contract Code section 22000 et seq. Contractors are invited to complete and submit the Contractors Letter of Interest Application to Purchasing Services Department as instructed on the application. The Contractors Letter of Interest Application is available on the District s webpage on Departments, Purchasing Services and then click on Contractors Letter of Interest Application ). 7. Purchasing Webpage Posting of Addenda and Bidder Questions Responses. During the course of bidding, the District may issue addenda ( Addenda ) or issue responses to bidder questions that do not result in issuance of Addenda ( Bidder Questions Responses ). The District will not distribute Addenda or Bidder Questions Responses; Addenda and Bidder Questions Responses will be posted on the Purchasing Webpage. The District s posting of Addenda and/or Bidder Questions Responses on the Purchasing Webpage is deemed the District s distribution of Addenda and/or Bidder Questions Responses to all bidders. 8. Project Plan Holder List. The District s Project Plan Holder List will be compiled exclusively from the sign-in sheet at the Mandatory Job Walk. Any Bidder failing to sign-in at the Mandatory Job Walk will be excluded from Project Plan Holder List and their Bid Proposal will be rejected by the District as being non-responsive. The District will not have a third party maintain a bid registry/plan holder list and will not distribute addenda directly to bidders/plan holders. 9. Prevailing Wage Rates. Pursuant to California Labor Code 1773, the Director of the Department of Industrial Relations of the State of California ( DIR ) has determined the generally prevailing rates of wages in the locality in which the Work is to be performed. Copies of the prevailing wage rates in the locality where the Work is to be performed, entitled PREVAILING WAGE SCALE are available to any interested party. The Contractor awarded the Contract for the Work shall post a copy of all applicable prevailing wage rates for the Work at conspicuous locations at the Site of the Work. The Contractor and all Subcontractors performing any portion of the Work shall pay not less than the applicable prevailing wage rate for the classification of labour provided by their respective workers in prosecution and execution of the Work. During the Work and pursuant to Labor Code 1771.4(a)(4), the DIR shall monitor compliance with prevailing wage rate requirements and enforce the Contractor s prevailing wage rate obligations. 10. Bidder and Subcontractors DIR Registered Contractor Status. Each Bidder must be a DIR Registered Contractor when submitting a Bid Proposal. The Bid Proposal of a Bidder who is not a DIR Registered Contractor when the Bid Proposal is submitted will be rejected for no responsiveness. All Subcontractors identified in a Bidder s Designated Subcontractors List must be DIR Registered contractors at the time the Bid Proposal is submitted. The Contractor may be subject to penalties by DIR of up to $10,000 for contracting with any subcontractor that is not DIR registered. The foregoing notwithstanding, a Bid Proposal is not subject to rejection for no responsiveness for listing Subcontractor the Subcontractors List who is/are not DIR Registered contractors if such Subcontractor(s) complete DIR Registration pursuant to Labour Code 1771.1(c)(1) or (2). Further, a Bid Proposal is not subject to rejection if the Bidder submitting the Bid Proposal listed any Subcontractor(s) who is/are not DIR Registered contractors and such Subcontractor(s) do not become DIR Registered pursuant to Labour Code 1771.1(c)(1) or (2), but the Bidder, if awarded the Contract, must request consent of the District to substitute a DIR Registered Subcontractor for the non-DIR Registered Subcontractor pursuant to Labour Code 1771.1(c)(3), without adjustment of the Contract Price or the Contract Time. 11. Bid Security. Each Bid Proposal shall be accompanied by Bid Security in an amount equal to Ten Percent (10%) of the maximum amount of the Bid Proposal, inclusive of any additive Alternate Bid Item(s). Failure of any Bid Proposal to be accompanied by Bid Security in the form and in the amount required shall render such Bid Proposal to be non-responsive and rejected by the District. 12. Labour & Materials Payment Bond; Performance Bond. Prior to commencement of the Work, the Bidder awarded the Contract shall deliver to the District two (2) Surety in the form and content included in the Contract Documents each of which shall be in a penal sum equal to One Hundred Percent (100%) of the Contract Price. 13. No Withdrawal of Bid Proposals. Bid Proposals shall not be withdrawn by any Bidder for a period of 90 calendar days after the opening of Bid Proposals. During this time, all Bidders shall guarantee prices quoted in their respective Bid Proposals. 14. Award of Contract. The Contract for the Work, if awarded, will be by action of the District s Board of Trustees to the responsible Bidder submitting the lowest priced responsive Bid Proposal. If the Bid Proposal requires Bidders to propose prices for Alternate Bid Items, the District s selection of Alternate Bid Items, if any, for determination of the lowest priced Bid Proposal and for inclusion in the scope of the Contract to be awarded shall be in accordance with the Instructions to Bidders. The District reserves the right to waive immaterial irregularities or informalities in any Bid Proposal or in the bidding process. Additionally, the District reserves the right to reject all Bid Proposals. The lowest responsive bid for the Work shall be determined as follows: Base Bid Amount, plus Allowance. 15. Disabled Veteran Business Enterprises ( DVBE ) Participation Goal. Pursuant to Military & Veterans Code 999.2 and the District s Board Policy, the District has established a Good Faith Participation Goal for DVBEs of Three Percent (3%) of the value of the Work. 16. American Disabilities Act (ADA). It is the intention of the Rancho Santiago Community College District to comply with the Americans with Disabilities Acts (ADA) in all respects. If, as an attendee or a participant at this meeting, you will need special assistance, the Rancho Santiago Community College District will attempt to accommodate you in every reasonable manner. Please contact the Rancho Santiago Community College District, Facility Planning, District Construction and Support Services at 2323 N. Broadway, Suite 112, Santa Ana, California, 714-480-7510, three business days prior to the meeting to inform us of your particular needs so that appropriate accommodations may be made.

Award

Educational

$1,380,788.00

Public - County

Renovation

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
231
Active Projects
110
Bidding Soon
2,369
All Active Projects
1,053
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 30, 2022

August 1, 2022

img_map_placeholder

1530 W 17th St, Santa Ana, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.