BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a medical facility in San Jose, California. Completed plans call for the construction of a 207,300-square-foot, 116-bed medical facility; and for site work for a medical facility.

New Construction of an approximately 207,300 square foot Behavioral Health Services Center comprised of a 66-bed acute psychiatric hospital for children, adolescents and adults, a 50-bed Emergency Psychiatric Facility, a Mental Health Urgent Care Facility, associated support areas. Project will include a tunnel connection to the Receiving and Support Center, and a bridge connection to the Main Hospital. Includes the following increments which combined make up the new BHSC Project: Increment 1 - Foundation, Structural frame, and under slab utilities: deep foundations, concrete foundations, steel superstructure, gravity and lateral systems, proprietary BRB system, utility pathways under building slab, misc. steel, bridge & tower superstructure. Increment 2 - Building Envelope Site & Site Utilities: exterior walls (thermal envelope), stairs and elevators, landscape and irrigation, and sitework. Increment 3 - Interior Improvements: interior build-out for building, tunnel and bridge, mechanical, electrical, plumbing, low voltage, security, fire alarm, fire protection, equipment and furniture anchorage, nurse call, pneumatic tube system (installation per HCAI and local applicable codes). I Increment 4 - Not within scope. (For reference only. Performed under preceding project PS3 Parking Structure Demolition.) Increment 5 - Delegated Design scope for Building Services: rainscreen anchorage, emergency generator/enclosure, system design details, vertical distribution including riser, elevators/vertical transportation genset, facade/skin engineering. Increment 6 - Delegated Design Scope for Interior Overhead MEP Supports and Seismic Anchorage: seismic point-load analysis and seismic anchorage and bracing for utilities. Site Improvement Drawings. Add Alternate 1: Cost to complete construction project within 27 months from Notice to Proceed (Substantial completion to 720 calendar days and final completion 820 calendar days). County of Santa Clara project no. DEV21-2730G, 263-CP19008-2 Project Number: 263-CPI9008, 619076.D

Under Construction

Medical

$422,852,989.00

Public - State/Provincial

New Construction, Site Work

2206

8

153

2

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
111
Active Projects
43
Bidding Soon
1,410
All Active Projects
613
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 4, 2022

February 13, 2023

img_map_placeholder

751 S Bascom Ave, San Jose, CA


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.