BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Remodeling and renovation of a playground / park / athletic field in El Portal, California. Completed plans call for the expansion of a playground / park / athletic field.

Scope of Work Synopsis: This Project will provide for a complete renovation to convert approximately 530 square feet of a current lobby/atrium area into additional office space for the ECC, renovation of the remaining approximately 130 square feet of the lobby/atrium area to retain a functional entryway including reconfiguration of a steel and concrete stairway to the second floor, installation of a split-unit unit HVAC system, installation of a 150 kilowatt generator and associated electrical equipment, and approximately 80 linear feet of new steel security fencing with personnel gate. General Description of the Work The Emergency Communications Center (ECC) at Yosemite National Park provides 24-hour all-risk communications for Yosemite National Park, Lassen Volcanic National Park, Devils Post pile National Monument, and Santa Monica Mountains National Recreation Area. The ECC is located within a small office within the 96,000 square foot El Portal Maintenance Facility Building. The ECC requires additional office space and electrical equipment in order to accommodate new operational requirements. This Project will provide for a complete renovation to convert approximately 530 square feet of a current lobby/atrium area into additional office space for the ECC, renovation of the remaining approximately 130 square feet of the lobby/atrium area to retain a functional entryway including reconfiguration of a steel and concrete stairway to the second floor, installation of a split-unit unit HVAC system, installation of a 150 kilowatt generator and associated electrical equipment, and approximately 80 linear feet of new steel security fencing with personnel gate Performance Period: 168 days from issuance of Notice to Proceed.

Post-Bid

Playgrounds / Parks / Athletic Fields

$400,000.00

Public - Federal

Remodeling, Renovation

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
40
Active Projects
24
Bidding Soon
352
All Active Projects
149
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 27, 2022

August 12, 2022

img_map_placeholder

5083 Foresta Rd, El Portal, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.