EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 18, 2022 at 8:00 PM

Updated October 1, 2024

Site work and paving for a civil project in Harrison City, Pennsylvania. Completed plans call for site work for a water / sewer project; bridge / tunnel; road / highway; and for paving for a road / highway.

As of August 17, 2022. Project has been awarded to Curry & Kepple, Inc. with a base bid in the amount of $1,590.247.40. The work will consist of the Contractor performing detention pond retrofits, storm sewer/ culvert pipe installation, inlet boxes, manholes, paving, restoration, erosion control, and appurtenances. The Contractor is advised that this project is being funded through the Pennsylvania Infrastructure Investment Authority (PENNVEST). Pennsylvania Prevailing Wage requirements apply to Contract 3/2022 as determined by the Secretary of the Department of Labor and Industry. All contractors must adhere to Act 127 of 2012 (Public Works Employment Verification Act), Nondiscrimination/Sexual Harassment Provisions, State Contractor Responsibility Program, the Americans with Disability Act, Anti-Pollution Regulations, Contractor Integrity Provisions, Prohibition of Illegal Alien Labor on Assisted Project Act and the Right-of-Know Law and the American Iron & Steel Act. Each Proposal shall be accompanied with a certified check or Bidder's Bond in the amount of ten percent (10%) of the proposal, in favor of Penn Township. No bidder may withdraw his bid within sixty (60) days after the actual date of the opening. Penn Township reserves the right to reject any or all bids or to waive any informality in bids received.

Award

Water / Sewer

$1,590,247.00

Public - County

Paving, Site Work

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Cleaning and Waste Management, Closeout Submittals, Bonds
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 10 - Specialties

Division 10 - Specialties

Storage Specialties, Postal Specialties, Mail Boxes
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Residential Furniture, Beds
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Rough Grading, Excavation and Fill, Excavation, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Mowing, Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Retaining Walls, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding
Division 33 - Utilities

Division 33 - Utilities

Storm Drainage Utilities, Culverts, Pipe Culverts
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
167
Active Projects
114
Bidding Soon
907
All Active Projects
438
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 30, 2022

August 1, 2022

img_map_placeholder

Multiple Locations, Harrison City, PA


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Harrison Park / Dolly Avenue Storm Water Improvements Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.