BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 12, 2022 at 8:00 PM

Updated September 14, 2023

Demolition, site work, paving and new construction of a mixed-use development in Raynham, Massachusetts. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; road / highway; road / highway; sidewalk / parking lot; sidewalk / parking lot; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; water / sewer project; and water / sewer project.

Copies may also be shipped to prospective bidders for an additional charge to cover handling and mailing fees. All payments for printing and shipping are nonrefundable. For addition to the project plan holder's list to guarantee receipt of addenda, it is recommended interested bidders obtain the Contract Documents directly from Accent. Interested bidders will be prompted to register an email address with Accent to access the documents. The scope of work includes the following: The scope of work includes removal of the existing concrete bridge and wingwalls, installation of a temporary cofferdam, installation of a new precast concrete arch and headwalls, construction of cast-in-place concrete footings and wingwalls, installation of bridge rail, new sidewalk and guardrail, installation of new drainage manholes, catch basins and pipe, and widening and full depth reconstruction of Mill Street within the project limits, slope grading, loam and seed, and temporary traffic control. Also included in the work is the installation of a new water main and hydrants on either side of the bridge, new insulated water main within a casing pipe supported by steel brackets on the upstream side of the bridge, removal and replacement of a temporary gravity sewer line on the downstream end of the bridge with a permanent insulated sewer line in a casing pipe supported by steel brackets, and installation of two new sewer manholes. MassDOT prequalification of contractors with the class of work as, Bridge - Culvert, for the project with an estimated value of $1,321,000 will be required. The Bidder further agrees to pay as liquidated damages the sum of five hundred ($500.00) Dollars for each consecutive calendar day

Post-Bid

Bridges / Tunnels

$1,321,000.00

Public - City

Demolition, New Construction, Paving, Site Work

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
500
Active Projects
193
Bidding Soon
3,750
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 7, 2022

September 5, 2022

Project location map

Mill St, Raynham, MA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.