BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a water / sewer project in Edgewater, New Jersey. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

In general, the work on this project consists of major maintenance upgrades at an existing wastewater treatment plant known as the "Edgewater Water Pollution Control Facility" for Bergen County Utilities Authority located in Edgewater Township, New Jersey. Questions Due Date: Aug 11th 2022, 2:00 PM EDT DESCRIPTION OF WORK A. The Contractors work on this project consists of the following major components of work: 1. Improvements to the existing UNOX Aeration system shall be paid for under the lump sum bid items "Agitator Repairs UNOX Train #1 and Agitator Repairs UNOX Train #2" and shall include but is not limited to all labor, materials, and equipment to complete the following: a. Electrically disconnect agitator motors, mechanically decouple agitator drives and impeller shafts, block impeller shafts in place, lift and remove drive assembly to staging point/truck. Lift agitator shafts out of mix tanks, place on supports so that lower impellers can be removed, clean agitator shafts and impellers. b. The Contractor is responsible for construction of support systems to suspend the fully loaded aerator shafts in a level position for inspection by the Owner and Engineer during disassembly. There shall be supports at each end of the shaft. The supports shall provide a minimum clearance of 12 inches from the end of an impeller to the existing grade. The number of supports to be constructed shall be as needed for completion of the aerator work. The Contractor shall consecutively remove all three mixing systems per train to complete the project efficiently. The Contractor shall provide detailed support system design plans to the Engineer for approval. The design shall include the dead loads and wind loads on the fully loaded shaft assembly in accordance with IBC 2018 requirements. The total dead load of each assembly is approximately 7000 pounds. The support structure shall be anchored to the ground or be ballasted to provide a stable structure and prevent overturning. The structure may be constructed of steel or wood framing. All proposed wood shall be pressure treated. c. Replace lower impellers, bearings, and seals. Parts to be provided by BCUA. d. After both train #1 and train #2 grit removal and tank cleaning are completed, lift agitator shaft into mix tanks and block in place, lift and move agitator assembly onto mix tanks, mechanically re-couple agitator drives and impeller shaft, remove blocking, lower assembly into tank, and bolt agitator to support structure. e. Electronically reconnect agitator motor. Perform operational testing per the Manufacturer's O&M manual.

Post-Bid

Water / Sewer

$3,000,000.00

Public - County

Renovation, Site Work

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
915
Active Projects
516
Bidding Soon
7,441
All Active Projects
3,112
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 26, 2022

September 23, 2022

November 11, 2022

img_map_placeholder

To Be Determined, Edgewater, NJ

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.