BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Houghton, Iowa. Completed plans call for site work for a water / sewer project.

Approximate quantities and items of work include furnishing and installing all materials and doing all work to Line all Clay sewers including: Mobilization; Traffic Control; most work is in yards and street right of way or public easement. Over 7,000 feet of CIPP Lining in existing 8" sanitary sewers; Cutting intruding taps; opening active services; grouting service connections; cleaning and internal inspections as normally included in a sewer REHAB project. All work is to be done in compliance with the drawings and specifications prepared by Warner Engineering Associates inc., Mount Pleasant, Iowa, which are now on file for public examination at the ENGINEER'S office and the City Clerk's office in HOUGHTON, IA. Each bid shall be made on a form furnished by the ENGINEER and accompanied by a bidder's bond with corporate surety satisfactory to the governing body, a check drawn on and certified by an Iowa bank or a U.S. chartered bank, or a certified share draft drawn on an Iowa credit union, and filed in a sealed envelope separate from the one containing the bid and in an amount equal to ten percent (10%) of the amount of the bid, made payable to the City of HOUGHTON, Iowa, and may be cashed by the City of HOUGHTON, Iowa as liquidated damages in the event the successful Bidder fails to enter into a contract within ten (10) days after award of the Contract and post bond satisfactory to the City of HOUGHTON insuring the faithful performance of the Contract. The bid security of the lowest three Bidders may be retained for a period of not to exceed sixty (60) days until a contract is awarded or rejection made. Other bonds or checks shall be returned after tabulation of bids. Payment to the CONTRACTOR for completed work on this project shall be made by the City of HOUGHTON, Iowa in cash from such funds as may be legally used for said purposes. This project is funded by a combination of City Cash on hand and Clean Water State Revolving Fund loans issued by the Iowa Department of Natural Resources. Payment to the CONTRACTOR shall be made monthly on estimates equivalent to ninety-five percent (95%) of the Contract value of the work completed since the last payment. Estimates shall be prepared prior to the Council meeting by the ENGINEER, who shall forward to the HOUGHTON City Clerk for payment each signed estimate before the next meeting of the City Council. Payment shall be made to the CONTRACTOR by the City Clerk within ten (10) days of approval by the Council. Final payment of the remaining five percent (5%) shall be made not less than thirty-one (31) days after completion and acceptance by resolution of the City Council of the completed contract, assuming that no unpaid claims remain on file, and subject to the conditions and provisions of Chapter 571 of the Code of Iowa. The CONTRACTOR shall comply with the Equal Employment Opportunity requirements of Executive Order 11246, Affirmative Action requirements, MEIENVBE/SBRA requirements and requirements to pay Federal Predetermined Wages as outlined in the Contract Documents. The CONTRACTOR shall be able to demonstrate a "good faith" effort was made to utilize MBEIWBE/SBRA businesses in this project. The successful Bidder shall be required to furnish a Performance and Payment Bond in an amount equal to one hundred percent '100%) of the Contract price, said bonds to be issued by a responsible surety approved by the City Council and shall guarantee faithful performance of the Contract and the terms and conditions therein contained, and shall guarantee the prompt payment of all materials and labor and protect and save harmless the City of HOUGHTON, Iowa from the claims and damages of any kind caused by the operation of the CONTRACTOR, and shall guarantee maintenance of the improvements for a period of two (2) years from and after its completion and Final Acceptance by the City Council, if the contract is awarded by the Council on June 28 2022, the SANITARY SEWER LINING -- 2022 shall be fully completed on or before November 30, 2022. If the contract award is delayed by the Council, the date for completion of the SANITARY SEWER LINING --2022 shall be extended by a time equal to the delay in award of a contract. A Notice to Proceed shall be issued the same day as execution of the Agreement by the City. The Bidder agrees to pay as liquidated damages the sum of $500 for each consecutive calendar day after the Contract completion date tnat the project is lot fu,,y completed.

Bid Results

Water / Sewer

$251,277.00

Public - State/Provincial

Site Work

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
55
Active Projects
19
Bidding Soon
396
All Active Projects
188
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 28, 2022

July 28, 2022

img_map_placeholder

Multiple Locations, Houghton, IA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.