Published July 28, 2022 at 8:00 PM

Updated September 14, 2023

Site work and paving for a civil project in South Harrison Township, New Jersey. Completed plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; and water / sewer project.

**As of July 28, 2022, project was awarded to R.E. Pierson Construction Company, awarded amount is $1,013,916.26.** The project will consist of the replacement of ail existing cmp storm pipe throughout the project. The work Shall include removing the existing pipe, installing the newly designated pipe, backfilling all pipe trenches within The limits of the road with controlled low strength material and the placement of 6” of hot mix asphalt base Course. Existing materials shall be utilized as pipe backfill outside of the road bed. Existing guiderail shall be Removed as needed and re-installed after the pipe has been replaced. All topsoil, seeding, fertilizing and Mulching shall be inclusive in the cost of the pipe, unless otherwise called out on the plans. The cleaning and Video inspection of all existing rcp storm pipe throughout the project shall be performed. Driveways Removed/damaged during the pipe installation shall be replaced. This also goes for all concrete curb adjacent To drainage structures. It shall be the responsibility of the contractor to have the utilities located before any excavation takes place and To exercise caution when excavating. The contractor at his expense shall repair any damage to utilities caused By construction. Any construction items that are designated "If and where directed", the actual quantity thereof shall be determined In the field by the engineer. The contractor shall be required to implement a traffic control plan. The traffic control plan must be based on The minimum requirements provided in the current manual on uniform traffic control devices (m.U.T.C.D.). Traffic Along the roadways shall be maintained by way of lane shifts and alternating traffic, through various stages of Construction, as noted in the supplemental specifications. Ah restoration and cleanup associated with the pipe replacement and rip rap placement shall be included in the Contract items performed at each location. No separate payment will be made for ground restoration. Solicitation no- ENERG. 21-12

Award

Water / Sewer

$1,013,916.00

Public - County

Paving, Site Work

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
757
Active Projects
398
Bidding Soon
5,090
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 30, 2022

August 1, 2022

Project location map

Clems Run, South Harrison Township, NJ

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.