Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published November 3, 2023 at 8:00 PM
Updated November 4, 2023
Site work for a water / sewer project in Myrtle Beach, South Carolina. Completed plans call for site work for a water / sewer project.
1. If contaminated groundwater is encountered, work should be halted and the contractor shall notify the Owner, the Engineer, and SCDHEC immediately to allow evaluation of conditions by the Engineer, or his agent, and SCDHEC. No groundwater should be pumped, bailed, or otherwise discharged from the excavation. Any equipment or materials which come in contact with groundwater should not be removed from the immediate work area until potential levels of contamination have been assessed. 2. The proposed line being laid should be immediately sealed to prevent potentially contaminated water from flowing into the pipe. All workers should leave the excavation. Any equipment or other articles which have come into contact with the groundwater should be flushed with fresh water. 3. Samples of the groundwater will be collected by the engineer or his agent for testing. The constituent to be determined in the testing regime will be based upon the location with respect to the currently identified SWMUs (Solid Waste Management Units). Testing could include but is not limited to hydrocarbons, solvents, heavy metals, herbicides and pesticides. A work stoppage of 3 days should be anticipated for each such event. Last Day for Questions: Friday, October 20, 2023 by 5:00pm As of August 2, 2022, bids received were rejected as they were over the budget. No definite date for the rebid. Construct and assemble two (2) pre-manufactured Kayak launch docks with associated wooden decks and ADA ramps for accessing the Lake at the Linear Park at the Market Common area Linear Park adjacent to the ITAP Aviation Industrial Park. Construct & assemble 2 pre-manufactured kayak launch docks with wooden decks & ADA ramps.
Award
Water / Sewer
$194,185.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 1, 2023
December 1, 2023
Thunderbolt St, Myrtle Beach, SC
Related To This Project
Myrtle Beach, SC
--
Myrtle Beach, SC
Bid Date: Aug 03 2022
Myrtle Beach, SC
Bid Date: Oct 21 2021
Myrtle Beach, SC
Bid Date: Sep 15 2021
Myrtle Beach, SC
Bid Date: Aug 08 2022
Myrtle Beach, SC
Bid Date: Dec 30 2022
Myrtle Beach, SC
Bid Date: May 05 2021
Myrtle Beach, SC
--
Myrtle Beach, SC
Bid Date: Aug 02 2022
Myrtle Beach, SC
--
Myrtle Beach, SC
Bid Date: Jul 20 2022
Myrtle Beach, SC
Bid Date: Jul 21 2022
Myrtle Beach, SC
--
Myrtle Beach, SC
--
Myrtle Beach, SC
--
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed