BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Pleasanton, California. Contact the soliciting agency for additional information.

The construction of the PFAS Treatment and Wells Rehabilitation Project (Project) will be defined by future bid documents and is anticipated to include the construction of groundwater well facilities improvements and a new centralized treatment facility (CTF) located at the City's Operations Service Center (OSC) for disinfection, fluoridation, and PFAS treatment of the City's groundwater. The PFAS treatment system will utilize granular activated carbon media and have an ultimate design capacity of 8,100 gallons per minute (gpm) but may be limited to 5,800 gpm for the initial phase of the Project. The scope of work for the granular activated carbon (GAC) media supplier will be defined by the Project's future bid documents and is anticipated to consist of manufacturing and delivery of GAC media for the initial fill, commissioning-phase support, training, and documentation. The City will procure separate contracts for pressure vessel equipment and on-going media supply services. GAC media suppliers must successfully complete the prequalification process outlined in the prequalification documents in order to be listed in the Project's future bid documents as an allowable supplier of GAC media. Prequalification is a two-step process that includes 1) submittal of an SOQ to demonstrate compliance with minimum qualification requirements and 2) participation in rapid small-scale column testing (RSSCT) conducted by an independent laboratory to demonstrate compliance with minimum performance requirements for PFAS removal. Questions should be directed to the project manager by phone at (925) 931-5519, or by email at tyamello@cityofpleasantonca.gov. Questions will only be answered by reference to particular sections of these prequalification documents. If interpretation is deemed necessary, then the question shall be addressed in writing and a clarification shall be given to all prospective suppliers through addenda. To allow time for issuance of addenda, questions shall only be accepted prior to seven (7) calendar days before the SOQ deadline date.

Post-Bid

Water / Sewer

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
142
Active Projects
56
Bidding Soon
1,855
All Active Projects
788
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 26, 2022

August 26, 2022

img_map_placeholder

Multiple Locations, Pleasanton, CA

Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.