Site work and paving for a sidewalk / parking lot in Benton Harbor, Michigan. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
**As of July 18 2022, the project has not yet been awarded. A timeline for award has not yet been established.** The project includes but is not limited to: Install of an new sidewalk on west side of Beckwith Hall to the firepit area, repair/replacement of sidewalk flags at the Mendel Center southeast walkway near the Hanson Theatre entrance and crosswalk areas. Install crosswalk landing sidewalk by lot 2 center crosswalk to Mendel. The Owner reserves the right to reject any and all submissions without explanation, either in whole or in part; to waive informalities and/or to negotiate separately in any matter whenever it is deemed in the sole opinion of the Owner to be in its best interest. It is the intention of the Owner that the construction of this project will start no later than seven (7) working days following award of Contract or Letter of Intent to award contract. Selection Criteria for this project will be based on the lowest base bid (including all projects) Bids that are unsigned, improperly signed or sealed, conditional, illegible, obscure, contain arithmetical errors, erasures, alterations, or irregularities of any kind, may at the discretion of the Owner, be declared unacceptable. Bid Forms, Appendices, and enclosures which are improperly prepared may, at the discretion of Owner, be declared unacceptable. INQUIRIES/ADDENDA A.Direct questions to the LMC Purchasing & Risk Manager, Nathan Main, via email at nmain@lakemichigancollege.edu. B. Addenda may be issued during the bidding period. All Addenda become part of the Contract Documents. Include resultant costs in the Bid Amount. C. Verbal answers are not binding on any party. D. Clarifications requested by bidders must be in writing not less than 3 days before date set for receipt of bids. The reply will be in the form of an Addendum, a copy of which will be forwarded to known recipients. Bidders are encouraged to utilize the services of minority and women owned subcontractors and suppliers where possible in the pursuance of this project. Before the start of construction, a pre-construction meeting shall be held. It shall be the Contractor's responsibility to arrange said meeting as soon as notification of award has been made by the College, Coordinate location of the meeting with the LMC Project Manager. Once the work is started, it shall proceed to completion without delay. DURATION OF OFFER A. Your offer is required to be submitted under a condition of irrevocability and forfeiture of your entire bid security for a period of 30 days after submission. B. Upon acceptance by the College, an executed copy of the contract will be returned to the Contractor as their official notice of award. The Contract, however, shall not be in force until the Contractor has complied with all of the requirements of insurance and bonds.
Bid Results
Sidewalks / Parking Lot
$29,945.00
Public - State/Provincial
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 22, 2022
July 7, 2022
2755 E Napier Ave, Benton Harbor, MI
Related To This Project
Benton Harbor, MI
Bid Date: Jul 28 2022
Benton Harbor, MI
Bid Date: May 30 2023
Benton Harbor, MI
Bid Date: Jul 13 2022
Benton Harbor, MI
Bid Date: Aug 10 2022
Benton Harbor, MI
Bid Date: Aug 05 2022
Benton Harbor, MI
Bid Date: Aug 31 2022
Benton Harbor, MI
Bid Date: Jan 04 2023
Benton Harbor, MI
Bid Date: Feb 22 2023
Benton Harbor, MI
Bid Date: Jun 07 2022
Benton Harbor, MI
Bid Date: May 11 2022
Benton Harbor, MI
Bid Date: Jun 03 2022
Benton Harbor, MI
Bid Date: May 10 2022
Benton Harbor, MI
Bid Date: Apr 13 2022
Benton Harbor, MI
Bid Date: Jun 22 2022
Benton Harbor, MI
Bid Date: Nov 18 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.