BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Naples, Florida. Conceptual plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Scheduling of Design Process: Consultant shall schedule the design of the Project to an efficient and timely completion, including the availability of sufficiently experienced staffing, equipment, software, etc. The intent of this RPS is to complete the design within fifteen (15) months. The design is to be fully permittable with all required local, State and Federal agencies. The permitting process shall be initiated at completion of the 30% design phase of the project. It is understood that final permit approvals are not able to be guaranteed by the Consultant and that permitting time may further extend the design process. The Consultant will demonstrate abilities to perform storm sewer/box culvert design, maintenance travel way design, local roadway reconstruction design, and stormwater quality treatment pond design, detailed construction sequencing plan design, detailed complex maintenance of traffic design with an emphasis on: o stormwater piping/box culvert design, o reinforced concrete structure design, o weir and spillway design, o preparation of detailed construction sequencing plans including structural supports for major underground utilities, o preparation of detailed maintenance of traffic plans involving partial and/or total closure of multi-lane roads, o nutrient load reduction, o peak storm attenuation/distribution, and o littoral and other water quality treatment planting design, if applicable, o SCADA design for water level monitoring and water quality sampling The Consultant will demonstrate abilities to successfully complete: o environmental permitting through Federal, State and local agencies, o local zoning and development order requirements, o bidding assistance, and o construction-related support services. 100% Construction Documents - Consultant shall prepare 100% construction documents for the Project that address comments or revisions to the 90% detailed design plans and also incorporate permit conditions from permit agencies. County reserves the right to modify this scope during negotiations for budgetary reasons.

Conceptual

Water / Sewer

$6,953,000.00

Public - County

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
37
Active Projects
19
Bidding Soon
298
All Active Projects
116
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 14, 2023

img_map_placeholder

Goodlette-Frank Rd, Naples, FL

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.