BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a pre-engineered storage facility in Saint Charles, Missouri. Completed plans call for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.

**As of Sept 2, 2022 this project has not yet been awarded. A timeline for award has not yet been established.** The work will consist of designing, detailing, fabricating, erecting, and constructing up to two (2) Metal Sided Outbuildings of varying size and their foundations in accordance with the requirement documents and other incidental work. The successful bidder shall be required to comply with the State Statutory Provisions concerning the payment of prevailing wages on public works, Section 290.210 through 290.340 R.S. MO 1959, as amended 1969 and shall pay to all workmen performing work under this contract not less than the prevailing hourly rate of wages determined by the Department of Labor and Industrial Relation of the State of Missouri. The wage rates applicable to this project have been predetermined as required by law and are set forth in this document. When Federal wage rates are applicable and included, this contract is subject to the"Work Hours Act of 1962", (P.L. 87-851: 76 Stat. 357) and implementing regulations. For those projects with a total cost greater than $75,000.00, Annual Wage Order No. 28 as amended May 13, 2021, shall be used. The bid proposal shall be made on a form provided by the County, delivered in a sealed envelope, and deposited in the office of the Finance Director on or before the time specified above. The proposal shall be accompanied by bid bond, cashier's check or certified check for an amount not less than five percent of the bid amount. The amount of the check or bid bond shall be forfeited to the County upon failure or refusal of the successful bidder to enter into a contract or to furnish bond after his proposal has been accepted. The County reserves the right to require the successful bidder to file proof of his ability to properly execute the project together with his record of successful completion of similar projects. The County reserves the right to reject any and all bids or proposals submitted, or to advertise for new bids. The County reserves the right to defer the acceptance of any proposal and the execution of a contract for a period not exceeding forty-five (45) days after the date of opening of the bids. The successful bidder to whom the contract has been awarded shall sign and return the contract and other required certificates and documents in quadruplicate within ten (10) days after the date of the receipt of the award of the contract. The successful bidder shall file certificates with the County that he has obtained and will continue to carry workmen's compensation insurance, public and private liability and property damage insurance and builders risk insurance in the specified amounts for the duration of the contract. The contractor shall not commence work prior to the date of written notice from the County Engineer to begin work and shall fully complete all work under this contract prior to March 1, 2023, the rate of progress and the time of completion being essential conditions of this contract. Full Notice to Proceed is expected to be on or about August 29, 2022. Special Needs: If you have special needs addressed by the Americans with Disability Act, please notify Purchasing Manager at (636)949-7465 at least five (5) working days prior to the bid opening. The County hereby notifies all bidders that it will affirmatively insure that in any contract entered into pursuant to this advertisement, minority business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, religion, creed, sex, age, ancestry, or national origin in consideration for an award.

Bid Results

Warehouse / Distribution - Pre-Engineered Storage Building

$295,091.00

Public - County

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
90
Active Projects
41
Bidding Soon
826
All Active Projects
322
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 7, 2022

October 3, 2022

img_map_placeholder

Multiple Locations, Saint Charles, MO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.