BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a stadium in Jackson, Tennessee. Completed plans call for the renovation of a stadium.

Invitations must be obtained from zpolk@jacksontn.gov . City reserves the right to waive informalities and to reject any and all bids/proposals. The City of Jackson is an Equal Opportunity Title VI employer. Instructions: Provide budgetary pricing for the following: o Chiller replacement and stand-alone controls o Boiler replacement and stand-alone controls o Air handler(s) replacement and stand-alone controls o Central controls o Pipe flushing Provide broken out pricing for each line item above and provide a total budget price for the entire project. Summary: This project consists of the replacement of the HVAC system for most of the facility. The HVAC system currently consists of an air-cooled chiller, hot water boiler, pumps, air handlers, heaters and two-pipe distribution system. This scope will serve as an outline to develop project budgets but is not intended to be an exhaustive list of the work required. Each contractor should walk the facility to understand the current conditions and scope of work. It is likely that the entire project cost will exceed the allocated budget for this project, so the project cost developed by the contractor should be broken down to allow the most necessary portions of the project to be released. These budgets should be "turnkey" meaning that all necessary components and work shall be included without the owner having to involve other owner hired contractors to provide portions of the work (cutting or patching holes, electrical power, controls, ductwork, or piping modifications, etc.). It is probable that components such as insulation will have asbestos. The bidding contractor shall include asbestos testing and remediation on any building materials that are found to have asbestos and are affected by this work. All work shall be according to code and performed by skilled tradesmen. The recommended budget breakdown is as follows: o Replacement of the chiller including pumps, piping modifications, stand-alone controls and new main control valves o Replacement of the boiler including pumps, piping modifications, flue, combustion air intake, stand-alone controls and new main control valves o Replacement of the air handlers including piping and duct modifications, control valves and stand-alone controls o Installation and commissioning of a central controls system o Flushing of the entire existing piping system and repair of dam

Post-Bid

Arenas / Stadiums

$170,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
58
Active Projects
29
Bidding Soon
417
All Active Projects
185
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 29, 2022

July 29, 2022

img_map_placeholder

304 N Hays Ave, Jackson, TN


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.