Published March 25, 2025 at 8:00 PM

Updated March 26, 2025

Site work for a water / sewer project in New Orleans, Louisiana. Working plans call for site work for a water / sewer project.

REFERENCING AMENDMENT 0001 POSTED ON 3/24/25, THIS REQUIREMENT IS HEREBY CANCELLED IN ITS ENTIRETY Freshwater Bayou - Lock to the Gulf, Freshwater Bayou, Maintenance Dredging #21-2, Vermilion Parish, Louisiana This is an UNRESTRICTED procurement. The work consists of removal of material from within the Calcasieu River Ship Channel; satisfactory disposal of a portion of the material to be placed within Long Point Bayou and BUDMAT sites, and disposal of the remainder of the material in the designated Confined Disposal Facilities adjacent to the Calcasieu River and Pass; all as shown on the drawings. Removal of material from within Devil's Elbow is included as optional work. The work also includes retention dike construction, surveys, optional ditching and draining of disposal areas, and all operations incidental thereto. The estimated value of this work is between $25,000,000 and $100,000,000. All Questions Must Contain the Solicitation Number in The Subject Line. In Accordance With Federal Acquisition Regulations; All Questions Must Be Submitted in Writing. Any Questions Received in Any Other Format Will Not Warrant a Response. Questions Must Be Sent via Email and Received by Tbd. Local Time, Tbd. The Government is Under No Obligation to Provide a Response to Late Questions. All Inquiries Regarding This Solicitation Should Be Made to the Following: Quinton Hamm, Contract Specialist, U.s. Army Corps of Engineers, New Orleans District E-mail: Quinton.b.hamm@usace.army. Mil Phone: (504) 862-2340 Collect Calls Not Accepted *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. SMSA Counties MS 19.2% 6.9 SMSA Counties LA 31.0% 6.9 Non- SMSA Counties 27.7% 6.9 Liquidated damages to the Government in the amount of $3,030.00 for each calendar day o

Final Planning

Water / Sewer

$10,000,000.00

Public - Federal

Site Work

7

20

2

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
240
Active Projects
127
Bidding Soon
868
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 9, 2022

September 25, 2025

Project location map

To Be Determined, New Orleans, LA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.