Site work and paving for a bridge / tunnel in Nashville, Tennessee. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
https://www.bizjournals.com/nashville/news/2023/01/20/broadway-bridge-closure-replacement-tdot-detours.html Jan 20, 2022 The widest and most traveled of the three bridges that are gateways to downtown Nashville will close for eight weeks beginning July 5, so that a new one can be built. State officials revealed new details of the construction process for a new Broadway bridge on Jan. 19, including renderings of the final design. The new bridge will look very similar to the existing one and have the same number of lanes (six), but with larger sidewalks and a row of planters to act as a buffer between pedestrians and vehicles. More than 23,000 vehicles cross the bridge on an average day -- equal to the average daily traffic over the Church Street and Demonbreun Street bridges combined. Those two bridges feature prominently in the planned detour routes once officials shut off access to the Broadway bridge. Charlotte Avenue also likely will see more traffic as a result of those detours. The impact of the bridge shutdown will be far-reaching, and not just on the downtown side of the bridge, whose nearby landmarks include the Grand Hyatt, Frist Art Museum, historic Union Station Hotel, an apartment tower with a Whole Foods and a newly built office tower. The bridge is a primary route for delivery trucks and WeGo buses. In Midtown, on the other side of the downtown interstate loop, detours will begin at 14th Avenue -- a stretch that witnesses almost 33,000 vehicles on the average day, according to state estimates. This map shows the planned detours for the eight weeks this summer when the Broadway bridge will be demolished and rebuilt. Blue is the main detour, routing drivers to Demonbreun or Church streets; red is the actual bridge closure; yellow is for local access only; green is a pedestrian route; orange and dark blue routes provide interstate access. Enlarge This map shows the planned detours for the eight weeks this summer when the Broadway bridge will be demolished and rebuilt. Blue is the main detour, routing drivers to Demonbreun or Church streets; red is the actual bridge closure; yellow is for local access only; green is a pedestrian route;... more TENNESSEE DEPARTMENT OF TRANSPORTATION The bridge, built in 1948, spans the CSX railroad tracks that slice through downtown. The bridge is nearing the end of its lifespan, according to the state Department of Transportation. Officials have said the new bridge could last 75 to 100 years. Next month, traffic will be narrowed to two lanes either direction on the existing bridge. Access will be shut off on July 5 to allow for the bridge replacement to happen. The bridge will reopen to traffic on Sept. 1, and the project will be completed Oct. 31, according to the construction schedule published on TDOT's website. TDOT website's also includes this FAQ, with questions such as "will you please improve the design of the bridge" and "why is there not a dedicated bike/pedestrian lane" Kiewit Infrastructure South Co., part of Kiewit Corp., won the contract to build the bridge at an estimated cost of nearly $72 million. _________________________________________________________ Davidson County Project No. 19019-3225-04 SR-1 (Broadway), Bridge Over 11th Ave South and CSX R/R, LM 17.29 (IA) Project Length - 124238.000 miles Completion Time - On or before 10/31/2023 (See Special Provision 108B) Each bid must be accompanied by an electronic bid bond or a Cashier's or Certified Check made payable to the Department of Transportation, or Irrevocable Letter of Credit naming the Department as beneficiary (for Mowing and Litter projects only), in an amount equaling not less than five percent (5%) of the amount bid. A Prime Contractor must prequalify with The Department of Transportation in accordance with Tennessee Code Annotated 54-5-117 and Tennessee Department of Transportation Rule 1680-5-3, Prequalification of ontractors, before bid authorization for highway contracts will be furnished. Prime contractors, except mowing and litter removal contractors, are required to be licensed with the State of Tennessee, Department of Commerce and Insurance (TDCI), Board for Licensing Contractors (BLC). Prime contractors must be licensed in the general classification (e.g. Heavy Construction (HC), Highway, Railroad, Airport Construction (HRA), Specialty (S), Municipal and Utility Construction (MU), or Electrical Contracting (CE)) for the type of work in the project which they will perform. Bidders may submit a Proposal without having a license and will be considered for award for twenty-one (21) days after Proposals are opened. If the Bidder does not have a license with the TDCI, on or before twentyone (21) days after Proposals are opened, the Bidder will be considered non-responsive and their Proposal will be rejected. TNDOT - 001 - SR-1 (Broadway), Bridge Over 11th Ave South and CSX R/R
Post-Bid
Bridges / Tunnels
$800,000.00
Public - State/Provincial
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
9
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 26, 2022
November 25, 2022
TN-1, Nashville, TN
Related To This Project
Nashville, TN
Bid Date: Dec 15 2022
Nashville, TN
Bid Date: Dec 15 2022
Nashville, TN
Bid Date: Nov 16 2022
Nashville, TN
Bid Date: Nov 07 2022
Nashville, TN
--
Nashville, TN
Bid Date: Nov 28 2023
Nashville, TN
--
Nashville, TN
Bid Date: Aug 30 2022
Nashville, TN
--
Nashville, TN
Bid Date: Apr 13 2022
Nashville, TN
--
Nashville, TN
Bid Date: Oct 05 2022
Nashville, TN
--
Nashville, TN
--
Nashville, TN
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Stop wasting time. Get and stay ahead of your competition.
Get instant access to the most complete and actionable commercial construction data available. Try it for free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.