Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 2, 2025 at 8:00 PM
Updated June 3, 2025
Site work and paving for a sidewalk / parking lot in Fullerton, California. Conceptual plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
UPDATE : Maintenace of the existing asphalt concrete pavement by applying slurry seal to approximately 1,000,000 SF of pavement. Any pavement cracks will be sealed prior to application of slurry seal. Pavement striping and markings will be reinstalled at the conclusion of the project. Project costs include design, construction, inspection and administration. The City must provide project design plans for FAA review and approval as part of the FAA grant application. The Airport Enterprise Fund typically funds the plan development, project bidding and associated staff administration costs, however, these costs are eligible for reimbursement as part of the approved total grant funding amount. Funding is anticipated to be provided by a FAA Grant (Federal) and Caltrans Grant (State). FAA Grant typically covers 90% of the costs with the Caltrans Grant typically providing 5% of the costs and the City required to provide the remaining 5% match to receive the funding Project is in City of Fullerton capital budget fy 2024-2025 CIP ___________________________________________________________________________________________ UPDATE : https://www.cityoffullerton.com/home/showdocumentid=7326&t=638253857388830000 Rehabilitiation of the approximately 1,000,000 SF of existing asphalt concrete pavement. Work is expected to involve grind and overlay of the pavement. Pavement striping and markings will be reinstalled at the conclusion of the project. Project is in City of Fullerton capital budget fy 2023-2027 CIP 181 ______________________________________________________________________________________________________________________ Rehabiltiation of the approximately 1,000,000 SF of existing asphalt concrete pavement. Work is expected to involve grind and overlay of the pavement. Pavement striping and markings will be reinstalled at the conclusion of the project. The project is included in the City of Fullerton' FY 2022-2027 Capital Improvement Program (CIP). As of June 13, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Sidewalks / Parking Lot
$1,375,000.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 1, 2027
4011 W Commonwealth Ave, Fullerton, CA
Related To This Project
Fullerton, CA
--
Fullerton, CA
--
Fullerton, CA
Bid Date: Jan 18 2023
Fullerton, CA
Bid Date: Jun 15 2022
Fullerton, CA
Bid Date: Jul 12 2022
Fullerton, CA
Bid Date: Jun 17 2022
Fullerton, CA
Bid Date: Jun 28 2022
Fullerton, CA
Bid Date: Jun 07 2022
Fullerton, CA
Bid Date: May 18 2022
Fullerton, CA
Bid Date: Jun 11 2020
Fullerton, CA
Bid Date: Aug 18 2021
Fullerton, CA
Bid Date: Jun 06 2022
Fullerton, CA
Bid Date: May 03 2022
Fullerton, CA
Bid Date: May 11 2022
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
