BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Fullerton, California. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

As part of a settlement agreement with the Department of Justice, multiple Amtrak stations are required to implement improvements to provide facilities that meet the current American with Disabilities Act (ADA). Fullerton is included as one of the locations. Since the City owns the property (leases the building to Amtrak), the City is responsible to complete the improvements. Improvements are expected to include upgrades to the building and restroom, directional signage, parking stalls, signage, removal of obstructions, curb ramps, path of travel slopes, handrail modifications, etc. Improvements will be phased over three years. Phase 1 was completed in FY 21-22 and involved small scale improvements that were accompilshed by staff such as determination of scope of improvements, signage replacement and installation, striping revisions, etc. Phase 2 will be completed in FY 22-23 and is expected to involve design of restroom upgrades, parking stall modifications, curb ramp reconstruction, ramp reconstruction, drinking fountain replacement, etc. Phase 3 is scheduled for FY 23-24 The project is included in the City of Fullerton's FY 2022-2027 Capital Improvement Program (CIP). Per the owner, as of July 6, 2022, the project is still in the initial phase. The owner states that they do not have a design team or a general contractor on the project. A timeline for design and construction has not been determined. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$1,000,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
225
Active Projects
97
Bidding Soon
2,286
All Active Projects
1,012
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2023

img_map_placeholder

120 E Santa Fe Ave, Fullerton, CA

Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.