Site work for a water / sewer project in Royal Oak, Michigan. Completed plans call for site work for a water / sewer project.

2025 Water Main Improvements - CAP2511 - City of Royal Oak Water main upgrades on: Woodward, Buckingham to Normandy; Woodward, north of Starr; Chester, Hillside to Dukeshire, Dukeshire - Chester to Normandy; Sheridan/Arden Place (plus rain gardens), Yorba Linda (Dukeshire to Woodward) Also includes road millage improvements on these roads including full reconstruct of Yorba Linda. As of November 13, 2024, this project is included in the City of Royal Oaks' FY 2024-2030 CIP. Information regarding a design team and the contractor selection has not been disclosed. A firm timeline for construction has not been established. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. Installing new 12" HDPE DIPS DR11 pipe using the horizontal direction drilling method along the north side of the 8 Mile Right-of-Way between the back of curb and property lines from Mendota Ave. to approximately 650' east of Wyoming Ave and installing new 8" HDPE DIPS DR11 along Mendota Ave. from Eight Mile Road to Fitzgerald Pl., Pasadena Ave. from Mendota Ave. to Ithaca Ave., Fitzgerald Pl. from Mendota to Evers Pl., and Woodside Ave from Northend Ave. to 250' south of Pasadena Ave. Project consists of curedin-place pipe lining along Glen Lodge Avenue from the south dead end to Bates Street. Total quantities of new water main installed for this project are 6,155 feet of 8" diameter pipe by horizontal directional drilling, 1,081 feet of 8" diameter pipe by open cutting, 1,710 feet of 12" diameter pipe by horizontal directional drilling and 203 feet of 12" diamter pipe by open cutting. Total quantity of 8" diameter water main cured-in-placed pipe lined is 1,579 feet. Question Deadline 11/27/2024 Questions, comments, or concerns of any Bidder regarding bidding, the Procurement Documents or the project, shall be submitted to Bradley Shepler, P.E. at bshepler@hrcengr.com.

Post-Bid

Water / Sewer

$3,270,000.00

Public - City

Site Work

40

10

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
154
Active Projects
78
Bidding Soon
1,455
All Active Projects
571
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 4, 2024

February 3, 2025

img_map_placeholder

Multiple Locations, Royal Oak, MI


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.