BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a transportation facility in Winnipeg, Manitoba. Completed plans call for the renovation of a transportation facility.

The Work to be done under the Contract shall consist of Transit maintenance and repair building mechanical upgrade - west high bay The major components of the Work are as follows: (a) Old/obsolete HVAC equipment and associated components will be demolished and roof openings patched. (b) New roof mounted, dual core heat recovery units (HRU's) will be provided for a ventilation rate of 1.5 cfm / sq ft. HRU's will be connected to the natural gas system. (c) HRU supply air will be at the middle of the G Track. (d) HRU exhaust air will be at high level along the north of the G Track; high and low levels along the south of G Track. (e) New CO/NOx sensors will be provided in the G Track and connected to the new monitoring / logging system. (f) Sprinkler system will be modified to accommodate demolished and new equipment. (g) Digital controls will be provided and tied into the existing JCI Metasys system to City of Winnipeg standards. (h) Electrical provisions will be provided to serve new mechanical loads. (i) Structural upgrades including columns and piles to support HRU. (j) Existing Infrared Heaters will be removed and replaced. (k) Roof hydrants will be provided for maintenance of roof mounted equipment. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

Award

Transportation Terminals

$1,987,042.00

Public - City

Renovation

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
21
Active Projects
6
Bidding Soon
214
All Active Projects
54
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 13, 2022

May 8, 2023

img_map_placeholder

421 Osborne St, Winnipeg, MB

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.