BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Springfield, Massachusetts. Contact the soliciting agency for additional information.

LOCATION: Springfield State Office Building, 436 Dwight Street, Springfield, MA 01103; Springfield Data Center, 53 Elliot Street, Springfield, MA 01105 three (3) one year options to renew at DCAMM's sole discretion, for up to three (3), one (1) year renewals to a maximum end date of June 30, 2026. 1. PURPOSE: The purpose of this memorandum is to provide a scope of work for Solid Waste and Recycling Services, at the Springfield State Office Building (SSOB) and the Springfield Data Center (SDC). 2. NEED: The need exists for a Contractor to perform effective Solid Waste & Recycling Services at the Springfield State Office Building and Springfield Data Center, in accordance with executive order 403 of the Commonwealth of Massachusetts and with all requirements of the Operational Services Division FAC86 contract. 3. CURRENT SITUATION: The Springfield State Office Building and Springfield Data Center each require a Contractor to be responsible for equipment, transportation and satisfactorily managing, supervising, and performing effective Solid Waste & Recycling Services at the above-named facilities in accordance with executive order 403 of the Commonwealth of Massachusetts and with all requirements of the Operational Services Division FAC86 contract. 4. PROJECT DESCRIPTION: The Contractor is responsible for equipment, transportation and satisfactorily managing, supervising, and performing effective Solid Waste & Recycling Services at the Springfield State Office Building, Springfield, MA, and the Springfield Data Center, Springfield, MA, in accordance with executive order 403 of the Commonwealth of Massachusetts and with all requirements of the Operational Services Division FAC86 contract. The contractor is responsible for obtaining all local, State and Federal licenses and permits required for the work described herein. The vendor shall be responsible for removing all waste and recyclable items that is collected in the buildings. Vendor employees must be considerate of employees and visitors to SSOB and SDC through training and supervision of personnel working at the building. Contractor shall provide DCAMM with copies of all manifests indicating the amount of waste, the type of waste and at what facility the waste was disposed. Contractor shall also provide similar manifests for all recycled materials. Manifest shall be submitted to the Facility Manager within 30 days of receipt by Contractor. Contractor shall provide the following training services at no cost: Initial facility assessment to identify the most effective and efficient waste and recycling program. Advise on the types of equipment, supplies and other appropriate materials An initial training session to explain the collection system(s) to facility and janitorial staff. A Building Profile and building specific Scope of Work is provided for the Springfield State Office Building, and Springfield Data Center in Appendix B and C of this SOW, respectively. WASTE REMOVAL SCOPE Provide, maintain, pick-up and empty containers as scheduled. Provide additional pick-ups as requested by the Facilities Manager, or designee. Provide recycling services. (See Recycling below) Monthly reporting itemizing Waste and Recycling tonnage broken down by each following category: Waste (non-recyclables) Plastic Aluminum Glass Paper (including cardboard, newspaper, magazines etc.) RECYCLING SERVICES Provide and maintain containers for recycling collection for the buildings. Containers to be picked up on a scheduled basis from the buildings. Paper materials to be recycled include but are not limited to copy paper, colored paper, computer paper, fax paper, magazines, newspapers, and cardboards. Comingle materials to be recycled include plastic, aluminum, and glass. Contractor shall provide a Certificate of Recycling certifying that all materials collected for recycling were in fact recycled and not otherwise disposed of. Contractor shall provide to DCAMM within 30 days of Contract execution a summary of credits or rebates available to DCAMM for recyclable materials. Such summary shall include any actions that could be taken to increase potential credits or rebates. In the event credits and/or rebates are available, Contractor shall pursue receipt of them diligently and provide DCAMM with such credits and/or rebates.

Post-Bid

Municipal

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
388
Active Projects
183
Bidding Soon
3,320
All Active Projects
1,416
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 24, 2022

July 1, 2022

img_map_placeholder

Multiple Locations, Springfield, MA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.