BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 14, 2022 at 8:00 PM

Updated January 29, 2024

This is a service / maintenance or supply contract in Rochert, Minnesota. Contact the soliciting agency for additional information.

CLASS 5 MODIFIED GRAVEL STOCKPILE Erie Township will be accepting bids to produce a Class 5 modified gravel stockpile of approximately 5,000 yards. The modification shall have a requirement of not less than 9% of the material shall pass the 200 screen when tested via the sieve analysis method. The produced stockpile shall be purchased by Erie Township at the contract bid price. This shall be a separate stockpile to be used by the township as directed by the Board of Supervisors. The location of the stockpile shall be determined by the successful bidder. Yardage to be determined by weight on a certified scale at time of production. A factor of 1.4 tons to be used as a cubic yard. Sieve analysis shall be performed by a State of Minnesota Certified Inspector at time of production at required rate of testing. All material incorporated into the stockpile shall be from material sources that are currently certified to be used, certification shall be by the person or persons responsible for material sources under their jurisdiction. Applicants shall have liability insurance with a minimum of $1.23 million. pfront costs shall be the cost of the material in stockpile and the crushing cost, will be paid by Erie Township upon completion of production of stockpile. Based on weighed known quantity of approximately 5,000 cubic yards of CL 5 modified material. Gravel cost will be no more or no less than $__________ per cubic yard based on approximately 5,000 cubic yards. Erie township will be responsible for up front crushing costs of $__________ per cubic yard based on approximately 5,000 yards. Related costs: o Royalties; stripping and reclaiming pit $___________ per yard oLoading costs $___________ per yard o Becker County Gravel Tax $___________ per yard o Total cost of CL 5 modified gravel, $___________ per yard, delivered Due to unknown fuel costs the bidder may elect to have an escalating fuel cost included in quote. Escalating Fuel Cost: _____________________________ _____

Post-Bid

Roads / Highways

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
32
Active Projects
19
Bidding Soon
287
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 21, 2022

July 21, 2022

Project location map

Multiple Locations, Rochert, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.