BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 7, 2022 at 8:00 PM

Updated September 14, 2023

Demolition, site work and addition to a military facility in McConnell AFB, Kansas. Completed plans call for the addition of a military facility.

The Contractor shall conduct demolition and construction efforts at Building 670 IAW Attach 2 - SOW dated 12 May 2022. The Contractor shall provide all labor, materials, tools, expertise, testing, surveying, equipment, reports, samples, warranties, and transportation necessary to complete the project according to the Statement of Work, plans, specifications, and contract documents. The effort will consist of a base bid and two options. The base bid work shall include the complete interior demolition of existing building 670 and construction of new offices, toilets/showers and a new addition for a training/kitchen/work bay area. Additionally, a new AHU is to be installed along with 2 gas-fired unit heaters, exhaust fan and new LED lighting. Site work will consist of installation of new fence/mow strip, pole mounted light fixtures, relocation of current post mounted keypads. Additionally, contractor shall install sanitary sewer lines, new mud/oil interceptor with tie into the existing sanitary sewer line, new concrete pad, generator and new reinforced concrete paving. Option 1 work includes the replacement of all communications wiring and jacks within existing building and new addition. Option 2 work includes the completion of all work associated with cybersecurity for the facility. All work, including options is to be performed IAW Attach 2 - SOW dated 12 May 2022. Magnitude of Construction: $1M - $5M *Amendment 1, 2, 3, 4 and 5 have been released.

Post-Bid

Military

$5,000,000.00

Public - Federal

Addition, Demolition, Site Work

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
48
Active Projects
31
Bidding Soon
442
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 8, 2022

August 23, 2022

Project location map

To Be Determined, McConnell AFB, KS

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.