BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in New Boston, New Hampshire. Working plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Town Hall front entry replacement. The front entry stairs and ramp will be removed, and a new set of stairs, ramp and landing will be installed with some changes to the existing footprint. The Goal is to create a safe, and ADA compliant entry way. This project will NOT include the entry door that will inevitably need to be updated to be fully ADA compliant. Demo- The contractor shall visibly mark the area under construction, as to prevent any foot traffic from attempting to cross into the "work zone" while construction is underway. The contractor shall keep the work area clean and reasonably free of hazards during construction. The contractor shall remove the existing front entry, as well as the decking from under the front overhang next to the entry door, Including the protruding structure of the deck, landing, ramp, stairs, and any granite or concrete found below and dispose of the material appropriately in necessary dumpsters and remove from site. Framing and footprint- The contractor shall construct a new 6'x10' deck/landing at the existing floor height. Framing shall be constructed out of pressure treated lumber. The contractor shall construct one set of stairs at the driveway side of the entry. Stairs will be 6' wide, with appropriate handrails and guardrails on each side of the stairs. The contractor shall construct an ADA compliant ramp. The ramp will be constructed to start at the opposite end of the main platform headed away from the stairs at first, then the ramp will turn 180 degrees and end at the driveway as close as possible to the new front entry. There shall be two 90 degree turns in the ramp, and each turn shall have an appropriate ADA compliant landing. The ramp footprint shall be extended into the yard away from the parking lot as much as necessary to keep the appropriate ramp slope. The lowest part of the ramp shall end at the parking lot shall not extend past the stairs to the front entry. The following ADA criteria shall be met for the ramp construction: Expected start date for this project should be no later that September 12, 2022 with a completion date within two weeks of start of work. Questions should be addressed to Laura Bernard, l.bernard@newbostonnh.gov or by calling (603) 487-2500 X161 Town Reservation of Rights: The Town of New Boston reserves the right to reject any and all proposals and waive any minor of non-material informality if deemed to be in its best interests.

Final Planning

Sidewalks / Parking Lot

$300,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
497
Active Projects
288
Bidding Soon
4,014
All Active Projects
1,637
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 15, 2022

February 24, 2023

img_map_placeholder

7 Meetinghouse Hill Rd, New Boston, NH


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.