BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a bridge / tunnel in Brighton, New York. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

D264913, pin 4t5022, fa proj y001-4t50-223, monroe co., overhead sign structure replacements, routes I-390, I-490, I-590, various locations., bid deposit: 5% of bid (~ $200,000.00) Overhead sign structure replacement for 2022 - monroe county. The periodic inventory of highway signs in region 4 has identified those that should be repaired or replaced on a cyclical basis to assure stability and reflectivity. This project will repair, replace or improve signs as needed with the priorities going to the most deficient on I-390 and I-590. The current status of the project is in development. The bid opening is expected to be in fall 2022. Construction is expected to begin in winter 2022/2023. Construction is expected to be completed in winter 2024/2025. This project is located in the genesee valley region and includes the following: Counties Monroe Every bid must be accompanied by a bid bond, certified check or bank cashier's check payable to the nys department of transportation, in the sum of the amount shown on the proposal title page. Bonds must be on form conr 391. Electronic bids must include an electronic bid bond. Project related technical questions or comments must be submitted through the construction contracting section of the nysdot business center on the nysdot website contract administration or procurement questions may be submitted either through the website or directed to robert kitchen, or the assistant director/director of the office of contract management, (518) 457-2124. Please call (518) 457-2124 if a reasonable accommodation is needed to participate in the letting. NYDOT - Overhead Sign Structure Replacements

Award

Bridges / Tunnels

$4,455,731.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

317

15

14

6

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
172
Active Projects
109
Bidding Soon
1,282
All Active Projects
645
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 17, 2022

December 21, 2022

img_map_placeholder

I-390 & I-590, Brighton, NY


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.