EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 4, 2022 at 8:00 PM

Updated October 1, 2024

Renovation of a mixed-use development in Caledonia, New York. Completed plans call for the renovation of a educational facility.

Sealed bids, in DUPLICATE, are sought and requested by the Caledonia-Mumford Central School District (hereinafter called "Owner"), for the construction of the following Project: 2022-2023 Capital Outlay Project Bids are requested for a single prime contract for Electrical Work, in accordance with Drawings, Project Manual, and other Bidding and Contract Documents prepared by Hunt Engineers, Architects, Land Surveyors & Landscape Architect, DPC 4 Commercial Street, suite 300, 3rd Floor, Rochester, NY 14614. Bid Documents are also available for electronic viewing at website including an up to date Plan Holders list. All checks for sets of Bidding and Contract Documents shall be made payable to the Caledonia-Mumford Central School District. All checks for shipping and handling, and PDF sets, shall be made payable to Hunt Engineers, Architects, Land Surveyors & Landscape Architect, DPC. Caledonia-Mumford Central School District 2022-2023 Capital Outlay Project HUNT 2177-046 Section 00 11 13 ADVERTISEMENT FOR BIDS Section 00 11 13 Page 2 All Prime Contract Bidders who have paid the aforesaid deposit for an entire set of Bidding and Contract Documents and have submitted a bid with required bid security; and return such sets to Dataflow Inc. Rochester office in GOOD CONDITION within thirty (30) calendar days after the award of contract or rejection of bids, shall receive a refund of the full amount of such deposit. Any NON-BIDDER may be refunded his deposit only upon returning plans and specifications PRIOR to the bid opening. Postage and HANDLING are NOT REFUNDABLE. All questions prior to bid opening must be received by the close of business on June 23, 2022. Questions shall be directed to Shannon Davis at Hunt Engineers, Architects, Land Surveyors & Landscape Architect, DPC at email daviss@hunt-eas.com. All bidders request for information shall use the form located in specification 00 12 00 - Request for Information. A digital copy of this form is available upon request. As bid security, each Bid shall be accompanied by a certified check or Bid Bond made payable to Owner, in accordance with the amounts and terms described in the INSTRUCTIONS TO BIDDERS. The Owner requires that all bids shall comply with the bidding requirements specified in the INSTRUCTIONS TO BIDDERS. The Owner may, at his discretion, waive informalities in bids, but is not obligated to do so, nor does this represent that he will do so. The Owner also reserves the right to reject any and all bids. Under no circumstances will the Owner waive any informality which, by such waiver, would give one Bidder a substantial advantage or benefit not enjoyed by all other Bidders. No Bidder may withdraw his Bid before forty-five (45) days after the actual date of the opening thereof, unless a mistake due to error is claimed by the Bidder in accordance with INSTRUCTIONS TO BIDDERS. Attention of Bidders is particularly called to requirements as to conditions of employment to be observed and minimum wage rates to be paid under the Contract. Bidders should check in at the Main Office where they will be escorted to view the areas of work. Additional site visits are permitted by appointment only. Appointments shall be scheduled with Phil Keenan, Superintendent of Buildigs and Grounds; phone: (585) 538-3425.

Award

Educational

$44,200.00

Public - City

Renovation

6

9

3

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Maintenance Data, Bonds, Warranties, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Roofing and Siding Panels, Siding, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Tiling, Ceramic Tiling, Ceilings, Flooring, Wood Flooring, Resilient Flooring, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions
Division 13 - Special Construction

Division 13 - Special Construction

Special Facility Components, Fountains
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), HVAC Air Distribution, HVAC Ducts and Casings, HVAC Fans
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Identification for Electrical Systems, Instrumentation and Control for Electrical Systems, Lighting Control Devices, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Lighting, Interior Lighting, Exterior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Piece Material Handling Equipment, Cranes and Hoists, Hoists, Manufacturing Equipment, Dies and Molds, Molds, Assembly and Testing Equipment, Cutting Equipment

Find More Local Projects

Within 75 Miles of This Project
179
Active Projects
114
Bidding Soon
1,562
All Active Projects
674
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 30, 2022

August 29, 2022

img_map_placeholder

99 North St, Caledonia, NY


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

2022-2023 Capital Outlay Project - Electrical Work

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.