BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Renovation of a medical facility in Cincinnati, Ohio. Completed plans call for the renovation of a medical facility.

Summit Behavioral Healthcare, located at 1101 Summit Rd, Cincinnati OH, 45237, is a restricted and secure residential psychiatric hospital environment. It operates 24/7, 365 days per year. Summit is the largest behavioral health hospital in the state and has about 291 patient beds throughout the facility. The work on this project will involve replacing furniture in patient accessible areas in each patient unit. The existing furniture poses risk to the patients and will need replaced with new anti- ligature furniture that meet behavioral health design standards. The new furniture will require modifications to be made to the walls to accommodate the shape and size of the new furniture. Also, the project will design and install privacy walls between the beds in each patient room. Scope of Services The scope of this project will include the following: o Replace patient furniture including patient beds, mattresses, wardrobes, side tables, and dining room tables. o Designing and installing personal lockers on each unit for private patient items. Location to be within full view of nurse's station on a recessed wall. o The walls and floors of each patient bedroom are curved and will not allow furniture to be flush with wall, creating a potential ligature risk. Work will need to be done at each bedroom to correct this issue. Work to "straighten" the walls and floors in each bedroom in locations of new furniture may be required. Work on these walls not to exceed what is necessary to install new bedroom furniture. Alternate solutions welcome to be discussed surrounding this. o Install full height privacy walls between patient beds, roughly 4'x12'. This will be completed in every bedroom. EDGE Participation Goal Percent of initial Total A/E Fee: 5.0%

Post-Bid

Medical

$3,500,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
121
Active Projects
83
Bidding Soon
1,239
All Active Projects
540
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 28, 2022

August 1, 2023

img_map_placeholder

1101 Summit Rd, Cincinnati, OH

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.