Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 5, 2022 at 8:00 PM

Updated October 9, 2024

Site work for a water / sewer project in Charlton, Massachusetts. Completed plans call for site work for a water / sewer project.

The work of this contract generally consists of the repairs to the low-level outlet control valve and rip rap protection of the upstream and downstream face of the Little Nugget Dam. Each bid shall be accompanied by a bid security in the amount of 5% of the total bid amount. A Performance Bond and Labor and Materials Payment Bond each in the amount of 100% of the contract price will be required. Minimum wage rates as determined by the Commissioner of Department of Labor and Industries under the provision of the M.G.L. c. 149, 26 to 27H, as amended, apply to this project.

Under Construction

Water / Sewer

$120,000.00

Public - City

Site Work

7

19

2

3

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
958
Active Projects
476
Bidding Soon
6,252
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 6, 2022

August 5, 2022

Project location map

To Be Determined, Charlton, MA


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed