EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 10, 2023 at 8:00 PM

Updated October 1, 2024

Site work, paving and outdoor lighting for a mixed-use development in Norristown, Pennsylvania. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and for outdoor lighting for a road / highway.

The Scope of Work includes the following: Construction of Streetscape including, curbing, decorative sidewalk, ADA access ramps, lighting, and landscaping. Bids must be submitted unconditionally. No bidder may withdraw a bid within SIXTY (60) days after the scheduled closing time for receipt of bids. The Municipality reserves the right to waive any informalities, or to reject any or all bids. All prospective bidders are hereby notified that the contracts will require contractors and subcontractors to comply with certain state and local statutory and regulatory requirements, including, but not limited to, the following: Pennsylvania Prevailing Wage Rates. The Projects require all prime contractors and subcontractors to pay all laborers and mechanics employed on the Projects wages at rates not less than those prevailing on projects of a character similar in the locality. aEURc Non-Discrimination. The Projects require all prime contractors and subcontractors to agree not to discriminate on the basis of race, color, national origin, religious creed, age, handicap, disability, or gender. The Municipality has a Responsible Contractor Ordinance. The award of all contracts will be as per the requirements of this ordinance. All ContractoraEUR(TM)s submitting bids must be able to meet all the Requirements of this Ordinance if the total of the base bid and all alternates submitted are equal to $350,000.00 and above. Bids totaling less than $350,000 will not have to meet item #10 A & B of the ordinance. This ordinance pertains to all contractors and their subcontractors. Mandatory Bonds and Guarantees - A certified check or bid bond in the amount of 10% of the total bid will be required. Bid guarantees, performance bonds and payment bonds will be required in accordance with 40 C.F.R. A 31.36(h). Bonds are required to be issued by a surety licensed to do business in the Commonwealth of Pennsylvania. Clarification Deadline: 3/17/2023 4:00 PM Estimated Project Value: $500,000 to $550,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Roads / Highways

$733,967.00

Public - City

Outdoor Lighting, Paving, Site Work

13

12

4

Subscribe For Documents

56 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Project Management and Coordination, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Bonds
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Material Testing
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Lifts
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Rough Grading, Excavation and Fill, Subgrade Preparation, Excavation, Dewatering, Backfill, Compaction, Excavation Support and Protection
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Planting, Turf and Grasses, Seeding
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts

Find More Local Projects

Within 75 Miles of This Project
460
Active Projects
237
Bidding Soon
4,177
All Active Projects
1,987
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 22, 2023

April 30, 2023

img_map_placeholder

E Main St, Norristown, PA


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Main St. Scape Phase IV

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.