BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a bridge / tunnel in Fayetteville, West Virginia. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

** As of August 9, 2022, this project has not yet been awarded. The project is expected to be awarded at the Council Meeting on 08/10/2022, Wednesday. Dismantle and remove the existing structure, construction of new bridge abutments, pier, pier caps, a five (5) span pre-engineered steel pedestrian bridge, minor trail work, and related amenities as indicated in the Contract Documents prepared by Chapman Technical Group. The total bid price shall include the costs for furnishing labor and materials and performing all work set forth in the Advertisement for Bids, Information for Bidders, Form of Proposal, Standard General Conditions of the Construction Contract, Supplemental General Conditions and Detail Specifications and Drawings prepared by Chapman Technical Group. Immediately following the scheduled closing time for the receipt of bids, all proposals which have been submitted in accordance with the required provisions will be publicly opened and read aloud. Construction time limit is 180 calendar days. All bidding documents shall be submitted in a single envelope addressed to the Owner marked with the following information in the lower left-hand corner: "Name and Address of Bidder" Fayette County Commission Bid for Meadow River Trail Russellville Bridge Replacement To be opened at 10:00 A.M., LPT, July 27, 2022 No Bid may be withdrawn for a period of sixty (60) days after the time of the opening of the Bids. Any Contractor submitting a Bid on this project hereby certifies, indicates, and acknowledges that he has a valid WV Contractor's license and meets all the qualifications required by the statutes of the State and subdivision in which the work is to be performed. The Fayette County Commission reserves the right to reject any or all Bids.

Under Construction

Bridges / Tunnels

$981,245.00

Public - County

Demolition, New Construction, Paving, Site Work

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
30
Bidding Soon
356
All Active Projects
157
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 22, 2022

September 21, 2022

img_map_placeholder

To Be Determined, Fayetteville, WV

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.