BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Pierre, South Dakota. Contact the soliciting agency for additional information.

This project will perform cost analysis studies for the installation of solar systems on 6 buildings in Rapid City and Pierre. To be eligible for state energy grants, an energy project must meet a 15 year payback. A report will be provided for each of the buildings detailing energy outputs, preliminary equipment layouts, and payback analysis. This project will be for only a study, no detailed design or construction. Firms desiring to be considered for providing professional services for this project should send a statement of interest that outlines qualifications and experience for this project. Statements of Interest should at a minimum include the following: 1. Specialized expertise, capabilities, and technical competence as demonstrated by the team's capabilities, proposed approach and methodology to meet the project requirements. Include number of commercial/government projects designed over 50kW. (15%) 2. Resources available to perform the work, including any specialized services, within the specified time limits for the project. Include resumes of all personnel, including sub-consultants who will be assigned to this project for the entire duration. List number of years each team member has been with your firm. (15%) 3. Record of past performance, including price and cost data from previous projects, quality of work, ability to meet schedules, cost control, and contract administration. Include real world payback documentation for 5 past projects which have been in operation for 3 years or more. Provide at least 3 references for past projects completed with an energy monitoring system in place. The reference should include contact information for the facility manager and details on the project. (40%) 4. Availability and Familiarity with project locale. (5%) 5. Proposed project management techniques. (5%) 6. Ability and project history in handling special project constraints. Include information on how your firm has been creative in keeping costs within budget during the current high bidding environment. (20% The Method of Contractor Selection has not been determined at this Time.

Conceptual

Solar Power Generation

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
3
Active Projects
2
Bidding Soon
26
All Active Projects
8
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 6, 2023

img_map_placeholder

Multiple Locations, Pierre, SD


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.