BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work and new construction of a municipal facility in Columbus, Ohio. Completed plans call for the construction of a municipal facility; and for site work for a municipal facility.

***Please submit statement of qualifications and questions through the Bonfire Portal (use Google Chrome) at: https://columbus.bonfirehub.com/projects/80802/details. Scope: The City of Columbus, Department of Finance and Management is receiving Statements of Qualifications Construction Manager at Risk (CMaR) for the New Municipal Court Building. There will be no pre-submittal meeting. Project Description: The new Municipal Court Building will be located on the east side of the 300 block of South High Street between Mound St. and Fulton St. The site area is approximately 1.89 acres. The building will contain approximately 345,000 to 378,000 gross square feet of space on an estimated 7 to 10 floors plus a full basement. There will be approximately 26 courtrooms. The building will have secure parking in the lower level for the Municipal Court judges. Additionally, there will be a tunnel constructed under High Street, connecting the new Municipal Court building to the existing Franklin county Government Center. The projected construction cost will range from $175 MM to $210 MM depending on the final design. There will be a Community Benefits Agreement (CBA) utilized on this project. This Project has a MBE/WBE participation goal of twenty percent (20%). MBE/WBE prime offerors who have a documented disparity in the 2019 City of Columbus Disparity Study are eligible for the 5% proposal incentive credit. Only MBE's/WBE's certified by the City of Columbus will count toward the goal. The last day to submit questions is January 4, 2023 at 12:00 PM. Responses will be posted on Bonfire Portal as an addendum. Phone calls will not be accepted. For additional information concerning this RFSQ, including procedures on how to submit a proposal, you must go to online portal *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Municipal

$200,000,000.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
108
Active Projects
62
Bidding Soon
990
All Active Projects
420
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 11, 2023

May 20, 2026

img_map_placeholder

300 S High St, Columbus, OH

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.