Published August 21, 2025 at 8:00 PM

Updated October 16, 2025

Renovation of a fire / police facility in San Jose, California. Completed plans call for the renovation of a 13,385-square-foot, three-story above grade fire / police facility.

Engineer's Estimate: $2,980,000.00 (Base Bid), $894,598.00 (Bid Alternate No. 1), $1,095,402.00 (Bid Alternate No. 2), $529,049.00 (Bid Alternate No. 3), $240,951.00 (Bid Alternate No. 4) Description of Work: The Project generally involves two base bid phases. Base bid (Phase 1): includes the demolition and construction of interior walls within what used to be the Emergency Operation Center (EOC) to allow for the installation of new workstations, a reception area, two private offices, and a new IT room for the Fire Department. Modifications in this phase also include electrical, technology (removal of existing and installation of new cabling), and minor mechanical and plumbing work, amongst other minor adjustments. Base bid (Phase 2): includes the demolition of existing Fire and Police Departments offices and hallway along the southern side of the building; and the construction of a raised floor system to match existing raised floor height, which would allow for a continuous and uniform raised floor throughout the entire dispatch area (existing and new). In addition, this expansion accommodates 22 new Police and Fire Departments' Dispatch stations, and two additional private offices. Modifications in this phase also include mechanical, electrical, technology (removal of existing and installation of new cabling), and plumbing work, amongst others, minor adjustments. ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- This project provides funding for the expansion of the current 9-1-1 Call Center area on the 4th floor of the Police Communications Center and relocation of the displaced Fire Department offices due to the 9-1-1 Call Center expansion. Project is included in the City of San Jose's FY 2025-2028 Capital Improvement Program (CIP). As of April 1, 2025, information regarding a design team or a general contractor is not available. A firm timeline for construction has not been determined. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Award

Fire / Police

$5,424,500.00

Public - City

Renovation

111

15

59

6

Subscribe For Documents

87 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
330
Active Projects
169
Bidding Soon
2,629
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 14, 2025

October 14, 2025

Project location map

885 N San Pedro St, San Jose, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.